โ† Back to Daily Permits

๐Ÿ›ข๏ธ Ellis 5602 13-17 2B

Oasis Petroleum North America LLC ยท Williams County, ND ยท File #41546 ยท Generated 2026-02-13 11:58

API
3310506422
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Intent to set temporary 40K, 150' diameter AST/Poseidon freshwater tank from Rhinokore on landowner's field to feed frac and coil jobs for multiple wells (Ellis 5602 13-17 2B, 3B, 4B, Phoenix 5602 13-17 2B, 3B, 4B).โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Intent to Perform Work - Description (Operator)
Pre-selected vendor (Rhinokore) for temporary water infrastructure not typical in basic permit data; indicates coordinated multi-well frac operations with specific timing.
2025-12-03 Completions / Frac
Tier 3 Total depth reached on 06/19/2025 at 26,842' MD, awaiting completion; used Starsteer software for steering in Middle Bakken target window.
๐Ÿ“„ Geological Summary - Horizontal Wellbore
Specific software (Starsteer) for geosteering and precise target window (12-foot within Middle Bakken), indicating advanced operational choices.
2025-06-19 General Oilfield Services
Tier 3 Well spud on 05/23/2025 using Patterson 808 rig, with specific crew assignments including Badger directional supervisors and Pason gas detection.
๐Ÿ“„ Geological Summary - Well Summary
Detailed crew and equipment pre-selection (e.g., Badger, Pason) for directional and monitoring services, beyond routine rig info.
2025-05-23 Directional Drilling
Tier 3 Waiver requested for open hole logs, relying on offset well Straw POW 5602 42-17 within 1 mile for formation tops; GR-CBL to be run from TD to ground level.
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Open Hole Log Waiver - Description (Operator)
Non-standard logging approach bypassing full open hole suite, using nearby offset data, which is not obvious from routine permits.
2025-05-15 Regulatory / Permitting
Tier 3 Updated production facility location: wells flowlined to a facility on a different pad, consolidating production equipment at a central location per NDAC 43-02-03-48.1.
๐Ÿ“„ WELL SUNDRY FORM - Supplemental Information - Submit Revised/Corrected Information - Description (Operator)
Deviation from initial permit assumptions, indicating off-pad flowline routing and central facility use, not detailed in basic Scout data.
2025-03-27 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Water logistics and tank rental
Tank build starts December 3, 2025, for frac jobs; signals immediate opportunity for water hauling and temporary infrastructure services.
Flowline construction and facility consolidation
Updated facility location effective March 28, 2025, indicates ongoing need for pipeline routing to central pad.
Geosteering and directional drilling services
Well completed June 19, 2025, with specific vendors like Badger and Starsteer; potential for similar services on pending completions.