← Back to Daily Permits

🛢️ HBU Baptiste Federal 34X-11G

XTO ENERGY INC · Williams County, ND · File #41552 · Generated 2026-02-06 17:15

API
33-105-06428
Target Formation
Three Forks 1st Bench
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Waiver granted for tubing/packer requirement during completion, citing safety factors and casing integrity.⏱ URGENT
Sundry Form ID: 283536
2025-11-19 Regulatory / Permitting
Tier 3 Confidentiality status ends, making well data public.⏱ URGENT
Sundry Form ID: 290126
2025-12-29 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days to use smaller rig for surface hole before larger rig.⏱ URGENT
Sundry Form ID: 239548
2025-04-02 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on offset well data within a mile.
Sundry Form ID: 231709
2025-02-13 Regulatory / Permitting
Tier 3 Mid-lateral motor failure requiring trip and switch from invert oil-based mud to salt-water mud for lateral completion.
Executive Summary
Relative Mud / Fluids
Tier 3 Use of managed pressure drilling (MPD) system to maintain consistent wellbore pressure during drilling and connections.
Executive Summary
Relative General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Downhole motor and mud system services
Motor failure mid-lateral requires immediate replacement and mud switch; timing aligns with lateral drilling phase ending 11/04/2025.
Managed pressure drilling equipment
MPD used throughout drilling; demand peaks during active drilling from 06/29/2025 to 11/04/2025.
Casing integrity and pressure monitoring
Post-waiver (11/19/2025), focus on monitoring to ensure safety; relevant during flowback and production phases.