| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Waiver granted for tubing/packer requirement during completion, citing safety factors and monitoring for casing integrity without tubing installation.⏱ URGENT Sundry Form ID: 283541 |
2025-11-19 | Regulatory / Permitting |
| Tier 3 | Confidentiality status ends, allowing public disclosure of well data. Sundry Form ID: 290109 |
2025-12-27 | General Oilfield Services |
| Tier 3 | Geosteering guided by offset wells HOVE 42-3 and MARMON 9-1, achieving 100% lateral in tolerance with 80% in payzone. Geosteering Model and Final Interpretation |
2025-11-12 | General Oilfield Services |
| Tier 3 | Suspension of drilling approved for up to 90 days to use smaller rig for surface hole before larger rig, avoiding saltwater use initially. Sundry Form ID: 239551 |
2025-04-02 | Drilling Rigs |
| Tier 3 | Use of salt-water mud in lateral section, following invert oil-based mud in vertical, with 44 planned frac stages. Executive Summary and Geological Synopsis |
Relative | Mud / Fluids |