| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Waiver for tubing/packer requirement with assurances on casing integrity Sundry Form ID: 237013 |
2025-03-18 | Regulatory / Permitting |
| Tier 3 | Mud logging services begin at logging depth on August 1, 2025⏱ URGENT Geological Summary |
2025-08-01 | Mud / Fluids |
| Tier 3 | Suspension of drilling for up to 90 days to use smaller rig for surface hole before larger rig for TD Sundry Form ID: 236997 |
2025-03-18 | Drilling Rigs |
| Tier 3 | Waiver for filter sock container, not using filtration media Sundry Form ID: 236989 |
2025-03-18 | Regulatory / Permitting |
| Tier 3 | Waiver for open hole logs, relying on offsetting well data Sundry Form ID: 236983 |
2025-03-18 | Regulatory / Permitting |
| Tier 3 | Notification to adjacent operators for off-spacing unit drilling Affidavit |
2025-01-17 | General Oilfield Services |
| Tier 3 | Use of RigCloud electronic drilling recorder and Total Gas detection analyzer Geological Summary |
Relative | Drilling Rigs |