| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Spud date notification with rig details (Nabors X10) and cement information ๐ Notification of Work Performed Sundry Early spud with specified rig and cement volumes, indicating readiness post-suspension |
2026-03-04 | Drilling Rigs |
| Tier 3 |
Permit renewal requested due to expiration, with credit card payment for feesโฐ TIME-SENSITIVE ๐ Permit Renewal Sundry Proactive extension of permit validity, indicating ongoing commitment to the well |
2026-02-18 | General Oilfield Services |
| Tier 3 |
Suspension of drilling for up to 90 days using intermediate rig (Noble 6) for deepset surface casing before full rig mobilizationโฐ TIME-SENSITIVE ๐ Sundry Notice for Suspension of Drilling Non-standard drilling sequence to achieve cost savings by using smaller rig first, allowing up to 90 days for full rig arrival |
2025-04-15 | Drilling Rigs |
| Tier 3 |
Use of Noble Rig #6 for deepset surface casing, specified with specs for hookload, torque, and pit capacity ๐ Letter to NDIC re: Noble Rig #6 Selection of specific rig model for initial phase, differing from standard full-depth rigs |
2025-04-08 | Drilling Rigs |
| Tier 3 |
Waiver of open hole logs, relying on offsetting well (SC-TOM 153-98-1514H-1) for formation tops ๐ Open Hole Log Waiver Sundry Deviation from standard logging requirements, reducing operational costs and time |
2025-02-21 | Regulatory / Permitting |