| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Request for waiver from tubing/packer requirement during completion for fracture stimulation, citing safety factors and monitoring assurances.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41643 Non-standard completion approach bypassing packer to expedite post-frac operations, potentially reducing rig time. |
2025-09-24 | Completions / Frac |
| Tier 2 |
Use of wet shoe for stimulation through toe, with liner top at 10,105' MD. ๐ Preliminary Drilling Program Design choice for toe stimulation, differing from standard cemented liners. |
Relative | Completions / Frac |
| Tier 3 |
Suspension of drilling for up to 90 days to use smaller rig for surface hole, with larger rig Patterson 264 anticipated onsite 10/17/2025.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41652 - Suspension of Drilling Phased drilling strategy to optimize rig utilization and costs, deviating from standard continuous drilling. |
2025-10-17 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs, relying on offsetting well Rose Federal 34X-34C for formation tops. ๐ Sundry Form for Well File No.: 41652 - Open Hole Log Waiver Bypasses standard logging requirements, indicating confidence in offset data to reduce costs. |
2025-05-30 | Regulatory / Permitting |
| Tier 3 |
Waiver for filter sock container during drilling, as no filtration systems used. ๐ Sundry Form for Well File No.: 41652 - Filter Sock Container Waiver Non-routine waiver for environmental compliance, simplifying drilling setup. |
2025-05-30 | Mud / Fluids |