โ† Back to Daily Permits

๐Ÿ›ข๏ธ Rose Federal 4-34H

Continental Resources, Inc. ยท Williams County, ND ยท File #41652 ยท Generated 2026-03-20 20:24

API
33-105-06467
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Request for waiver from tubing/packer requirement during completion for fracture stimulation, citing safety factors and monitoring assurances.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41643
Non-standard completion approach bypassing packer to expedite post-frac operations, potentially reducing rig time.
2025-09-24 Completions / Frac
Tier 2 Use of wet shoe for stimulation through toe, with liner top at 10,105' MD.
๐Ÿ“„ Preliminary Drilling Program
Design choice for toe stimulation, differing from standard cemented liners.
Relative Completions / Frac
Tier 3 Suspension of drilling for up to 90 days to use smaller rig for surface hole, with larger rig Patterson 264 anticipated onsite 10/17/2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41652 - Suspension of Drilling
Phased drilling strategy to optimize rig utilization and costs, deviating from standard continuous drilling.
2025-10-17 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on offsetting well Rose Federal 34X-34C for formation tops.
๐Ÿ“„ Sundry Form for Well File No.: 41652 - Open Hole Log Waiver
Bypasses standard logging requirements, indicating confidence in offset data to reduce costs.
2025-05-30 Regulatory / Permitting
Tier 3 Waiver for filter sock container during drilling, as no filtration systems used.
๐Ÿ“„ Sundry Form for Well File No.: 41652 - Filter Sock Container Waiver
Non-routine waiver for environmental compliance, simplifying drilling setup.
2025-05-30 Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling rigs
Smaller rig Noble 1 for surface (completed), larger Patterson 264 anticipated 10/17/2025 for TD.
Mud logging and geosteering
Sudbrink and Columbine active during drilling from 9/14/2025 to 9/21/2025.
Directional/MWD services
Taktikal and Badger integrated throughout drilling period.
Completion and fracturing
Post-TD, with waiver allowing packerless setup for immediate frac and flowback.