🛢️ JOHNSON 27-34 6H

DEVON ENERGY WILLISTON, L.L.C · McKenzie County, ND · File #41680 · Generated 2026-02-06 17:15

API
3305310543
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 2 Variance to NDAC tubing/packer requirement, providing assurances on casing design, monitoring, and fluid properties for flowback without packer.
Sundry Form for Well File No.: 41680, FORM ID: 237088, DESCRIPTION (OPERATOR)
2025-03-18 General Oilfield Services
Tier 3 Waiver requested for collection of drill cutting samples in vertical portion, citing prior collection from offset well on same pad (JOHNSON 27-34 8H) to avoid duplication.
Sundry Form for Well File No.: 41680, FORM ID: 283812, DESCRIPTION (OPERATOR)
2025-11-24 Regulatory / Permitting
Tier 3 Waiver for filter sock container requirement, justified by non-use of filtration systems during drilling.
Sundry Form for Well File No.: 41680, FORM ID: 238964, DESCRIPTION (OPERATOR)
2025-04-03 Regulatory / Permitting
Tier 3 Approval for suspension of drilling (SOD) for up to 90 days, allowing initial spud with smaller freshwater-based rig followed by larger rig for full TD, with specific casing and cementing requirements.⏱ URGENT
Sundry Form for Well File No.: 41680, FORM ID: 237080, DESCRIPTION (OPERATOR) and REVIEWER COMMENTS
2025-03-19 Drilling Rigs
Tier 3 Waiver for open hole logs, relying on logs from offsetting well (JOHNSON 150-99-34-27-4H) within 1 mile for formation tops, with GR-CBL planned from TD to surface.
Sundry Form for Well File No.: 41680, FORM ID: 237059, DESCRIPTION (OPERATOR)
2025-03-18 Regulatory / Permitting

🎯 Operator Intent

🔧 Service Relevance

Directional drilling and surveying services
Multiple surveys completed in May-June 2025, with Mesa West and Taktikal involved; indicates active ecosystem for MWD and trajectory services post-spud.
Drilling rig services
Suspension approved March 2025 for up to 90 days, creating immediate opportunity for smaller rig mobilization and future window for larger rig in Q2-Q3 2025.
Completion and flowback services
Tubing/packer waiver approved March 2025 with approximate start October 2025, signaling need for casing monitoring and flowback equipment in late 2025.