| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Request for suspension of drilling for up to 90 days using Noble Rig #6 for deepset surface casing with fresh water-based mud, no saltwater, and plug requirement if not completed within timeframe.โฐ TIME-SENSITIVE ๐ Sundry Form Description (Operator) and attached letter from Jack Blickwede dated April 8, 2025. Non-standard drilling sequence using intermediate rig for surface casing to save costs and time, with strict 90-day window and abandonment clause if not followed by larger rig. |
2025-04-08 | Mud / Fluids |
| Tier 3 |
Approximate proposed start date for drilling operations.โฐ TIME-SENSITIVE ๐ Sundry Form Description (Operator). Specific future start date post-suspension approval, indicating planned delay for rig availability or optimization. |
2026-04-16 | Drilling Rigs |
| Tier 3 |
Use of Noble Rig #6 with specific specs (550,000 lbs hookload, 22,000 ft-lbs torque, etc.) augmented with auxiliary tank, confirmed capable for deepset surface jobs.โฐ TIME-SENSITIVE ๐ Letter from Jack Blickwede dated April 8, 2025. Selection of non-standard rig specs for surface casing, with augmentation for pit capacity, indicating tailored equipment choice. |
2025-04-08 | Drilling Rigs |
| Tier 3 |
Requirement for detailed samples and cores collection at specific intervals, with submission to State Geologist within 30-180 days. ๐ Letter from Ross Edison dated 3/24/2025 regarding Cores and Samples. Enhanced sampling protocol beyond routine, including washed cuttings and boxed cores, tied to regulatory preservation. |
2025-03-24 | General Oilfield Services |
| Tier 3 |
Waiver for open hole logs, relying on GR-CBL from TD to ground level and offsetting well logs for formation tops. ๐ Sundry Form for Open Hole Log Waiver, Description (Operator). Deviation from standard open hole logging requirements, using offset data and limited GR-CBL instead of full suite. |
2025-03-18 | Regulatory / Permitting |