โ† Back to Daily Permits

๐Ÿ›ข๏ธ Davidson 5795 31-33 4B

Chord Energy ยท Williams County, ND ยท File #41766 ยท Generated 2026-04-24 02:10

API
33-105-06494
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Total depth reached at 25,570' MD, with extrapolated survey to TD and specific target misses
๐Ÿ“„ Directional Survey Report and Geological Summary
Extrapolated survey data and precise target deviations reveal drilling precision and adjustments
2025-09-20 Directional Drilling
Tier 3 Well spud notification filed, with rig Nabors B26 and specific personnel details
๐Ÿ“„ Sundry Form for Notification of Work Performed
Detailed operational start with named rig and personnel, beyond basic permit data
2025-08-28 Drilling Rigs
Tier 3 Waiver requested for open hole logs, citing offset well Hartsoch 33-33 (NDIC File No. 6111) within 1 mile, with GR-CBL planned from TD to ground levelโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Open Hole Log Waiver
Non-standard logging program waiver based on proximity to offset well, potentially reducing costs and accelerating operations
2025-05-15 Regulatory / Permitting
Tier 3 ETJ notification to City of Tioga with detailed BMPs including security, alarms, and containment plans
๐Ÿ“„ City of Tioga ETJ Notification and Best Management Practices
Enhanced environmental and safety protocols for urban-adjacent operations
2025-03-31 General Oilfield Services
Tier 3 Drill-back notification to adjacent operator Murex Petroleum Corporation for wells entering Bakken Petroleum System outside target spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Proactive notification for inter-operator coordination in spacing units
2025-03-26 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion services
Well status 'Awaiting Completion' post-TD on 2025-09-20, with wet shoe liner design for efficient toe initiation
Directional and MWD services
Use of Taktikal Directional and specific MWD engineers during drilling from 2025-08-28 to 2025-09-20