โ† Back to Daily Permits

๐Ÿ›ข๏ธ Davidson 5795 31-33 6BX

Chord Energy ยท Williams County, ND ยท File #41768 ยท Generated 2026-04-24 02:11

API
33-105-06496
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Wet shoe configuration for liner cementing, intentionally over-displaced to allow wireline perforating without tubing
๐Ÿ“„ Full Well Details, Wet Shoe Discussion
Non-standard cementing technique to optimize completion efficiency by avoiding more expensive perforating methods
Relative Completions / Frac
Tier 3 Notification of spud date filed post-spud, confirming drilling commencement
๐Ÿ“„ Sundry Form for Well File No. 41768, Notification of Work Performed
Regulatory filing after operations started, highlighting timing of operational milestones
2025-09-02 Directional Drilling
Tier 3 Waiver requested for open hole logs, citing Hartsoch 33-33 offset well within 1 mile for formation tops sufficiencyโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41768, Waiver Request
Non-standard logging program deviation from NDIC Rule 43-02-03-31, relying on offset data instead of running porosity and resistivity logs
2025-05-15 Regulatory / Permitting
Tier 3 Drill-back notification to adjacent operator Murex Petroleum for wellbore traversing outside target spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Proactive compliance with Order No. 31848 for horizontal wells entering adjacent units
2025-03-26 Directional Drilling
Tier 3 ETJ notification to City of Tioga for pad location within extraterritorial jurisdiction, including BMPs for security and containment
๐Ÿ“„ City of Tioga ETJ Notification Letter
Enhanced regulatory scrutiny due to urban proximity, with commitments to fenced site, 24-hour monitoring, and spill prevention
2025-03-25 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional and MWD services
Drilling active from 2025-08-29 to 2025-09-05, with surveys every 30-90 feet; opportunity for Taktikal and MWD engineers during build and lateral phases
Mud logging and geological steering
Cuttings collection from 8,480' MD to TD, with Core Geologic on-site; timing post-spud for formation evaluation
Completion and cementing services
Wet shoe liner set at 9,507' MD, with cementing program; relevance post-TD on 2025-09-05 for wireline perforating