โ† Back to Daily Permits

๐Ÿ›ข๏ธ EN-Will Trust A- 157-94-2734H-5

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #41769 ยท Generated 2026-04-07 03:12

API
3306105502
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 3 Suspension of drilling for up to 90 days approved, planning to set surface casing with smaller freshwater-based rig, then mobilize larger rig within 90 days; approximate start date 9/29/2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41769, Suspension of Drilling
Non-standard phased drilling approach to avoid casing wear in vertical/curve sections, prioritizing cost and time savings over continuous operations.
2025-09-29 Drilling Rigs
Tier 3 Waiver of open hole logs requested, citing sufficient logs from offsetting well EN-Will Trust 14-23 (NDIC# 5831), with GR-CBL to be run from TD to ground level.
๐Ÿ“„ Sundry Form for Well File No.: 41769, Request for Consideration/Waiver, Type of Work: Open Hole Log Waiver
Deviation from standard NDIC Rule 43-02-03-31 requiring open hole logs, indicating cost-saving intent by leveraging existing offset data.
2025-04-04 Regulatory / Permitting
Tier 3 Waiver requested for adjacent unit notification under Order No. 31848 and 31973, as operator owns the adjacent units.
๐Ÿ“„ Letter from Derek Abrahamsen dated March 18, 2025
Self-waiver due to intra-company operations, reducing regulatory overhead for multi-unit development.
2025-03-18 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rigs (Smaller Scale)
Phased drilling starts with smaller rig around 9/29/2025 for surface casing, creating immediate opportunity for cost-effective rig services before larger rig mobilization.
Logging Services (GR-CBL)
Waiver of full open hole logs shifts focus to GR-CBL, potentially increasing demand for cased hole logging tools post-TD in late 2025.