| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver from tubing/packer requirement during fracture stimulation completion, with assurances on casing integrity and monitoring. ๐ SUNDRY FORM FOR WELL FILE NO.: 41775 DESCRIPTION (OPERATOR) - Tubing/Packer Waiver Deviation from standard NDIC casing and tubing requirements, relying on 32#/ft P-110 casing and real-time monitoring instead of packer installation. |
2025-09-24 | Completions / Frac |
| Tier 3 |
Remote stimulation of Rose Federal 4-34H from shared pad using temporary 5.5" 23# P-110 casing string, with pressure testing to 9500 psi and thermal cameras for leak detection.โฐ TIME-SENSITIVE ๐ SUNDRY FORM FOR WELL FILE NO.: 41775 DESCRIPTION (OPERATOR) - Remote Stimulation Request Non-standard remote stimulation setup from a multi-well pad, involving cross-well operations and enhanced safety protocols not typical for individual well completions. |
2025-10-05 | General Oilfield Services |
| Tier 3 |
Suspension of drilling operations for up to 90 days to allow smaller rig setup before larger Patterson 264 rig arrival.โฐ TIME-SENSITIVE ๐ SUNDRY FORM FOR WELL FILE NO.: 41775 DESCRIPTION (OPERATOR) - Suspension of Drilling Non-routine phased drilling approach using initial small rig for surface hole, followed by suspension and larger rig mobilization, to optimize costs. |
2025-09-09 | Drilling Rigs |
| Tier 3 |
Off-spacing drilling with executed Surface Use Agreement for wellbores entering Bakken outside target spacing unit. ๐ AFFIDAVIT OF Donavan Stevens - Off-Spacing Unit Drilling Regulatory approval for drilling beyond standard spacing units, requiring landowner agreements and anti-collision measures. |
2025-02-21 | Directional Drilling |