๐Ÿ›ข๏ธ GO-ZONA-157-98-3523H-2

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41778 ยท Generated 2026-08-24 04:43

API
3310506501
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Wet shoe design used on production liner to intentionally over-displace cement by 2 bbls and allow ability to 'frac out the shoe'.
๐Ÿ“„ DRILLING PROGNOSIS - Completion Equipment
Specific, non-standard cementing/completion design choice to facilitate future stimulation operations by ensuring shoe accessibility.
Unknown Completions / Frac
Tier 3 Pad location was cement-stabilized prior to spud (completed 6/25/2025), with a detailed reclamation plan requiring post-operation soil analysis and potential amendments.
๐Ÿ“„ Details of Hess Bakken Investments II, LLC Cement Stabilization Program
Non-routine pad construction method indicates investment in pad integrity and pre-planned, analytical final reclamation. Creates a specific future service need for soil milling, testing, and amendment.
2025-06-25 General Oilfield Services
Tier 3 Operator requested and received a 90-day suspension of drilling after surface casing to allow cost/time savings by using a smaller rig for surface hole and a larger rig later.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Suspension of Drilling
Reveals a deliberate operational staging strategy to optimize rig utilization and capital efficiency. This creates a defined window for the larger rig move-in and drilling services.
2025-04-08 Directional Drilling
Tier 3 Operator requested and received a waiver for open-hole logs, relying on offset well GO-JOHN-156-98-0508H-3 logs instead.
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver
Indicates a cost-saving or operational streamlining decision, reducing wireline/logging scope. Shows reliance on and confidence in specific offset data.
2025-04-08 Mud / Fluids
Tier 3 Five target changes were made throughout the lateral section during drilling.
๐Ÿ“„ GEOLOGIC SUMMARY - Lateral section
Indicates active, complex geosteering to remain in zone, suggesting geological heterogeneity or operational challenges.
Relative Directional Drilling
Tier 3 Initial landing target was raised from 10,810' TVD to 10,804' TVD due to markers coming in high.
๐Ÿ“„ GEOLOGIC SUMMARY - Curve section
Shows real-time adaptation of drilling plan based on actual formation encounters, indicating proactive geological oversight.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / Geosteering
High lateral length (~15,100 ft) and five mid-lateral target changes demonstrate critical need for precise, real-time geosteering to stay in zone and avoid collisions in a dense field.
Cementing & Downhole Completion Tools
Specific wet shoe liner design for future 'frac out' capability creates a need for specialized cementing services and completion hardware tailored to this engineered design.
Civil Earthwork & Reclamation
Cement-stabilized pad creates a future, defined scope of work for final reclamation involving soil milling, sampling, analysis, and potential amendment application.
Stimulation (Frac) Services
Well is 'awaiting completion' as of TD. Liner designed for multi-stage plug-and-perf with wet shoe for shoe access. This signals imminent frac campaign opportunity following drilling.
Real-Time Data & Wellsite Geology
Waiver of open-hole logs increases reliance on real-time data from mudlogging (Neset), MWD (Scientific Drilling), and geosteering for formation evaluation and decisions.