| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Cemented production liner in lateral with a wet shoe and ability to frac out the shoe, addressing south setback condition. π Permit Stipulations and Well Program & Schematic Unique completion design to meet regulatory setback requirements by cementing liner in lateral with wet shoe, enabling frac operations out of shoe. |
Relative | Completions / Frac |
| Tier 3 |
Trip due to low ROP at 18,239' MD on July 25, 2025, requiring BHA change. π Sample Descriptions section Non-routine drilling interruption indicates formation hardness or bit wear issues in the lateral, prompting unplanned BHA change and tripping. |
2025-07-25 | General Oilfield Services |
| Tier 3 |
Open hole log waiver granted based on logging a nearby well (Sofia 21-28-33-1H File# 42036) for geologic control. π Sundry Form for Well File No. 41832 (Form ID: 256108) Operator secured regulatory approval to waive standard open hole logging requirements, reducing time and cost. This indicates a pad-level logging strategy and reliance on offset data. |
2025-06-30 | Regulatory / Permitting |
| Tier 3 |
Permit reinstated after suspension due to competitor challenge; Phoenix Operating LLC withdrew its Application to Suspend and Revoke case 31770 on May 14, 2025. π Letter from NDIC dated May 29, 2025 Permit was suspended due to a competitor's legal challenge, indicating potential lease or spacing disputes. Reinstatement allows immediate operations, revealing urgency and possible contentious pad development. |
2025-05-28 | General Oilfield Services |
| Tier 3 |
Use of Zonevu software program for geosteering assistance. π Geological Summary section Specific geosteering software named, indicating operator's preferred technology for precise placement within Middle Bakken facies. |
Relative | General Oilfield Services |