โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-PETERS-157-97-3220H-4

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41893 ยท Generated 2026-08-22 00:08

API
3310506557
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Suspension of drilling requested for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling
Operator plans a two-rig strategy: small rig drills surface hole with freshwater mud, sets casing, then leaves. Larger rig must move on within 90 days to complete well. Reveals cost/time optimization and creates a defined window for rig and service mobilization.
2025-05-12 Mud / Fluids
Tier 3 MWD gamma tool failure during lateral drilling at 26,606' MD; decision made to continue drilling to TD without it.
๐Ÿ“„ GEOLOGIC SUMMARY - Lateral section
Real-time geosteering capability impaired late in lateral. Operator chose to proceed based on existing data, indicating risk tolerance and confidence in well path.
2025-12-24 General Oilfield Services
Tier 3 Regulatory stipulation: 'Due to the possibility of severe casing wear... surface holes are not to be intentionally deviated.'
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 41893 - REVIEWER COMMENTS
NDIC imposes a non-standard design constraint based on casing wear risk, limiting directional flexibility in the surface section.
2025-05-12 Directional Drilling
Tier 3 Open hole log waiver approved based on offset well data, only cased hole CBL/GR/CCL required.
๐Ÿ“„ WELL SUNDRY FORM - Open Hole Log Waiver
Operator avoids routine open hole logging, reducing time and cost. Indicates high confidence in offset well (HODENFIELD 15-33H) data for formation tops.
2025-05-09 Regulatory / Permitting
Tier 3 Specific sample collection and archiving protocol: two sets of samples to Hess Houston and ND Geological Survey Core Library.
๐Ÿ“„ GEOLOGIC SUMMARY
Explicit dual archival requirement beyond standard. Indicates operator's commitment to data preservation and regulatory compliance for core library.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Rig & Drilling Services
Two-phase rig requirement: small rig for immediate surface hole (planned start ~9/24/2025) and larger rig (Nabors X27) must be mobilized within 90 days after surface spud. Rig skidding operations on pad indicate sequential drilling.
Cementing & Casing
Specific cementing volumes and centralizer placement detailed for surface, production, and liner strings. Surface casing must be called in immediately after spud and plug bump per regulatory comment.
Sample Management & Shipping
Samples must be washed, dried, boxed, and shipped to two locations (Hess Houston and ND Core Library) within 30 days of drilling completion (TD reached 12/25/2025).
Directional Drilling & Surveying
Surface hole deviation prohibited per regulatory stipulation due to casing wear concerns. Anti-collision planning critical with multiple wells on pad and nearby existing wellbores.
Well Control & BOP Services
Specific BOP stack configuration (11" 5M) and testing protocol (function test every 7 days, pressure test every 21 days) mandated. Choke manifold includes remote operated hydraulic choke.