| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Suspension of drilling requested for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 days.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling Operator plans a two-rig strategy: small rig drills surface hole with freshwater mud, sets casing, then leaves. Larger rig must move on within 90 days to complete well. Reveals cost/time optimization and creates a defined window for rig and service mobilization. |
2025-05-12 | Mud / Fluids |
| Tier 3 |
MWD gamma tool failure during lateral drilling at 26,606' MD; decision made to continue drilling to TD without it. ๐ GEOLOGIC SUMMARY - Lateral section Real-time geosteering capability impaired late in lateral. Operator chose to proceed based on existing data, indicating risk tolerance and confidence in well path. |
2025-12-24 | General Oilfield Services |
| Tier 3 |
Regulatory stipulation: 'Due to the possibility of severe casing wear... surface holes are not to be intentionally deviated.' ๐ SUNDRY FORM FOR WELL FILE NO.: 41893 - REVIEWER COMMENTS NDIC imposes a non-standard design constraint based on casing wear risk, limiting directional flexibility in the surface section. |
2025-05-12 | Directional Drilling |
| Tier 3 |
Open hole log waiver approved based on offset well data, only cased hole CBL/GR/CCL required. ๐ WELL SUNDRY FORM - Open Hole Log Waiver Operator avoids routine open hole logging, reducing time and cost. Indicates high confidence in offset well (HODENFIELD 15-33H) data for formation tops. |
2025-05-09 | Regulatory / Permitting |
| Tier 3 |
Specific sample collection and archiving protocol: two sets of samples to Hess Houston and ND Geological Survey Core Library. ๐ GEOLOGIC SUMMARY Explicit dual archival requirement beyond standard. Indicates operator's commitment to data preservation and regulatory compliance for core library. |
Relative | General Oilfield Services |