๐Ÿ›ข๏ธ GO-PETERS-157-97-3220H-5

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41894 ยท Generated 2026-08-22 00:10

API
3310506558
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Operator requested and received approval for a 90-day suspension of drilling after spudding surface hole with a smaller rig, to be followed by a larger rig moving on within 90 days to complete drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling
Reveals a staged, cost-saving drilling strategy using two different rig sizes, creating a defined 90-day window for the larger rig mobilization and drilling services.
2025-05-12 Drilling Rigs
Tier 2 Drilling prognosis includes a contingency plan for a 'wet shoe' on the production liner to intentionally over-displace cement by 2 bbls and 'frac out the shoe', with all subsequent stages using plug and perf.
๐Ÿ“„ DRILLING PROGNOSIS - Completion Equipment section
Relative Completions / Frac
Tier 3 ND Geological Survey issued a specific sample collection mandate starting at the Base of the Last Charles Salt, with 30' intervals in vertical/build and 200' in lateral, and archiving at both Hess Houston and NDGS Core Library.
๐Ÿ“„ NORTH DAKOTA | Mineral Resources - RE: CORES AND SAMPLES letter
Regulatory mandate dictates precise sample collection protocol and dual archival, creating a fixed workflow for the mudlogging contractor.
2025-05-12 Mud / Fluids
Tier 3 Operator received approval to waive open hole logging requirements, relying on offset well HODENFIELD 15-33H (NDIC# 19130) within a mile, and will run only a GR-CBL from TD to surface.
๐Ÿ“„ WELL SUNDRY FORM - Open Hole Log Waiver
Indicates a deliberate cost and time-saving operational choice, reducing logging scope and vendor dependency for open hole services.
2025-05-09 General Oilfield Services
Tier 3 Permit stipulates 'Closed mud system with no cuttings pit' and a perimeter berm required around the entire location.
๐Ÿ“„ PERMIT INFORMATION - Conditions of Approval
Non-standard environmental containment requirement mandates specific waste handling infrastructure from the start of operations.
2025-05-08 Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rig Services (Large Rotary Rig)
A large rotary rig (Nabors X27) is scheduled to move onto location within a defined 90-day window after the surface hole is spudded by a smaller rig. The spud date is planned for approximately 9/24/2025, creating a predictable Q4 2025 mobilization opportunity.
Cementing & Completion Services
The well design specifies a 'wet shoe' completion for the production liner to enable fracturing out the shoe, followed by plug-and-perf stages. This requires precise cementing and completion coordination post-drilling (well reached TD 12/18/2025 and is 'awaiting completion').
Waste Handling / Solids Control
Permit condition mandates a 'Closed mud system with no cuttings pit,' requiring specialized waste handling and transportation services from spud through completion.
Civil Construction & Pad Building
Detailed engineering plans (KLJ) exist for a 6-well pad with specific containment berms, ditches, and access roads. Construction must precede the planned spud date of ~9/24/2025.