๐Ÿ›ข๏ธ GO-PETERS-LE-157-97-3220H-1

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41895 ยท Generated 2026-08-22 00:10

API
3310506559
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Operator requested and received approval for suspension of drilling operations for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 daysโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling
Reveals a staged drilling approach to save costs/time; creates two mobilization/demobilization events for rigs and associated services
2025-05-12 Drilling Rigs
Tier 3 Drilling operations speed restricted due to cold and windy conditions during tripping on December 13-14, 2025โฐ TIME-SENSITIVE
๐Ÿ“„ Daily Log of Operations
Weather-induced operational delays during critical path operations
2025-12-13 General Oilfield Services
Tier 3 MWD tool failure at 24,556' MD on December 12, 2025, requiring trip to replace BHA, causing ~26 hours of non-productive time
๐Ÿ“„ Geologic Summary and Daily Log of Operations
Unplanned tool failure in lateral section caused significant downtime and BHA replacement
2025-12-12 General Oilfield Services
Tier 3 NDIC mandated specific sample collection protocol: 30' intervals in vertical/build sections, 200' intervals in lateral, starting at Base of Last Charles Salt, with samples shipped to ND Geological Survey within 30 days of drilling completion
๐Ÿ“„ NORTH DAKOTA MINERAL RESOURCES letter re: CORES AND SAMPLES
Regulatory-driven sample program with strict intervals and tight deadline (30 days post-drilling) for sample processing and shipping
2025-05-12 General Oilfield Services
Tier 3 Operator requested and received waiver for open hole logs, relying on offset well HODENFIELD 15-33H (NDIC# 19130) within a mile, with only GR-CBL from TD to ground level required
๐Ÿ“„ WELL SUNDRY FORM - Open Hole Log Waiver
Indicates operator confidence in subsurface model and reduces logging costs/time; shifts focus to cased hole evaluation only
2025-05-09 Regulatory / Permitting
Tier 3 Eight target changes made throughout the lateral section, indicating active geosteering and formation navigation challenges
๐Ÿ“„ Geologic Summary
Higher-than-typical number of target adjustments suggests complex geology or proximity management
Relative Directional Drilling
Tier 3 All formation tops came in lower than prognosis (consistently 1-13 feet low), with landing target adjusted downward by ~1,003' TVD during curve section
๐Ÿ“„ Geologic Summary and FORMATION TOPS table
Systematic subsurface depth discrepancy requiring real-time geological adjustment and target modification
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Rig mobilization/demobilization services
Staged drilling approach requires two rig moves: smaller rig for surface section (3-5 days), then larger rig within 90 days. Creates two mobilization events in compressed timeline.
Sample processing and logistics
Regulatory requirement to process and ship samples to ND Geological Survey within 30 days of December 13, 2025 TD. Immediate post-drilling service window.
MWD/LWD tool reliability and backup services
MWD tool failure caused significant downtime; opportunity for tool inspection, replacement, and backup equipment services for long lateral operations.
Winterization and cold weather operations
Weather-related speed restrictions during December operations highlight need for heating solutions, equipment winterization, and weather contingency services.
Geosteering and real-time formation evaluation
Eight target changes in lateral and systematic formation depth discrepancies indicate complex geology requiring advanced geosteering services for upcoming wells on pad.
Cementing and zonal isolation services
Detailed cementing program with wet shoe design for frac-out capability indicates focus on completion efficiency; relevant for upcoming completion operations.