| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes a unique 'Bakken Setback Summary Statement': The north setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe. ๐ Permit Information - Stipulations Reveals a specific, pre-approved completion design element (cemented liner with wet shoe) that directly influences well placement and regulatory approval. It's a condition tied to the spacing exception. |
2025-05-08 | Completions / Frac |
| Tier 3 |
NDIC mandates specific, non-standard sample collection protocol: cuttings from Base of Last Charles Salt, at 30' max intervals in vertical/build, 200' max in lateral. Requires washing, drying, specific packaging, and shipment to state library within 30 days of drilling completion. ๐ Letter from State Geologist - Cores and Samples Imposes a detailed, prescriptive sample handling workflow that is more stringent than routine. Creates a compliance-driven service requirement with a firm 30-day deadline post-drilling. |
2025-05-12 | General Oilfield Services |
| Tier 3 |
Operator requests and is approved for a waiver of open hole logs, relying on offset well HODENFIELD 15-33H (NDIC# 19130) within a mile. Only a GR-CBL will be run from TD to ground level. ๐ Sundry Form - Open Hole Log Waiver Eliminates standard open hole logging suite. Reduces vendor opportunity for logging-while-drilling (LWD) and wireline services on this well, shifting focus to cased hole evaluation. |
2025-05-09 | Regulatory / Permitting |
| Tier 3 |
Approval stipulates a 'closed mud system with no cuttings pit'. Cuttings will be hauled to a state-approved facility. ๐ Permit Information - Stipulations Mandates a specific waste management approach, eliminating the option for an on-site cuttings pit. Requires pre-arranged hauling and disposal services. |
2025-05-08 | Mud / Fluids |
| Tier 3 |
Operator requests suspension of drilling for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 days to complete well. Explicitly states intent is for cost and time savings.โฐ TIME-SENSITIVE ๐ Sundry Form - Request for Consideration/Waiver - Suspension of Drilling Reveals a staged, cost-optimized drilling strategy using two different rigs. Creates a tight, 90-day window for the larger rig mobilization and completion drilling after surface casing is set. |
Relative | Drilling Rigs |
| Tier 3 |
Hess must contact NDIC Field Inspector Robert Stafford prior to location construction. Also must call immediately after spudding and when plug is bumped with casing/cement info, and when conventional rig moves back on. ๐ Permit Information - Stipulations & Reviewer Comments Imposes multiple, specific regulatory touchpoints with a named inspector. Creates a sequence of mandatory notifications that dictate operational pacing and oversight. |
Relative | Drilling Rigs |