๐Ÿ›ข๏ธ GO-RAY-157-97-3321H-3

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41898 ยท Generated 2026-08-22 00:14

API
3310506562
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Operator requested and received 90-day suspension of drilling after surface casing to use smaller rig for cost/time savings, with explicit condition to plug and abandon if not drilled by larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form - Request for Consideration/Waiver - Suspension of Drilling
Reveals strategic cost-saving approach using two rig sizes, creates 90-day window for service providers between surface casing and full drilling, and imposes abandonment risk if timeline not met.
2025-05-12 Drilling Rigs
Tier 3 Surface hole intentionally not deviated due to casing wear concerns, per NDIC comment on suspension request.
๐Ÿ“„ Sundry Form - Request for Consideration/Waiver - Reviewer Comments
Explicit prohibition on surface hole deviation due to wear risks, constraining directional options from surface.
2025-05-12 Directional Drilling
Tier 3 NDIC mandated specific sample collection protocol: 30' intervals in vertical/curve, 200' intervals in lateral, with dual archival at Hess Houston and ND Geological Survey.
๐Ÿ“„ Letter from ND Geological Survey - Cores and Samples
Regulatory-driven sample program with strict intervals and dual archival requirement, not standard operator discretion.
2025-05-12 General Oilfield Services
Tier 3 Operator obtained open hole log waiver based on offset well HODENFIELD 15-33H within one mile, eliminating routine logging requirement.
๐Ÿ“„ Sundry Form - Open Hole Log Waiver
Avoids standard logging costs and time, indicates confidence in offset data, and shifts focus to cased hole evaluation only.
2025-05-09 Regulatory / Permitting
Tier 3 Wet shoe design used on production liner to intentionally over-displace cement by 2 bbls, with rupture pins and plug chamber for visible bump.
๐Ÿ“„ Drilling Prognosis - Completion Equipment section
Non-standard cementing approach for liner with intentional over-displacement and specialized equipment for verification.
Unknown Completions / Frac
Tier 3 Three target changes made during lateral section drilling, indicating active geosteering adjustments.
๐Ÿ“„ Geologic Summary - Lateral section
Multiple mid-lateral target adjustments suggest complex geology or proximity management, requiring real-time geosteering decisions.
2025-11-22 to 2025-11-25 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Casing and Cementing Specialists
Wet shoe liner design requires precise execution; surface casing cementing had specific volume requirements (84 bbls to surface with 35%/15% excess); NDIC requires immediate call after spudding with casing/cement info.
Directional Drilling and Geosteering
Three target changes during lateral indicate active geosteering needs; anti-collision protocols require real-time monitoring; surface hole deviation prohibited, concentrating directional work below surface casing.
Sample Handling and Logistics
Mandatory 30'/200' sample intervals with dual archival (Houston and Grand Forks) creates consistent workflow; samples must be shipped within 30 days of drilling completion.
Plugging and Abandonment Services
Conditional requirement: if larger rig doesn't drill within 90 days of surface spud, well must be plugged and abandoned, creating potential emergency P&A work.