| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator requested and received approval for suspension of drilling operations for up to 90 days after spudding surface hole with a smaller rig, with intent to bring larger rig later to complete well.โฐ TIME-SENSITIVE ๐ Suspension of Drilling Sundry Form (FORM ID: 247096) Reveals a staged drilling approach to achieve cost and time savings. Creates a 90-day window between surface casing and full-depth drilling, impacting rig scheduling and service timing. |
Relative | Drilling Rigs |
| Tier 3 |
Approved spud date is in the future (9/29/2025), with detailed cementing report submitted showing adjusted depths for 'big rig' and volumes received vs. calculated.โฐ TIME-SENSITIVE ๐ Notification of Work Performed - Spud Date Sundry Form Well file contains a future spud date and associated operational details, indicating advanced planning and regulatory filing for work not yet performed. Cement report shows field adjustments. |
2025-09-29 | Drilling Rigs |
| Tier 3 |
Operator is required to collect and submit drill cuttings samples starting at the Base of the Last Charles Salt at specified intervals, and any cores, within strict timelines (30 days for samples, 180 days for cores).โฐ TIME-SENSITIVE ๐ Letter from ND Geological Survey regarding Cores and Samples Non-routine, prescriptive sample collection mandate with defined start point and submission deadlines. Indicates regulatory or geologic interest in specific formations. |
2025-05-19 | General Oilfield Services |
| Tier 3 |
Operator requested and received waiver for open hole logs, relying on offset well HICKEL 15-35H (NDIC# 19066) within a mile, and will only run GR-CBL from TD to surface. ๐ Request for Consideration/Waiver - Open Hole Log Waiver (FORM ID: 247104) Indicates a deviation from standard data acquisition, reducing logging scope. Shows reliance on existing subsurface data from a specific offset, suggesting confidence in the area's geologic predictability. |
2025-05-13 | Regulatory / Permitting |
| Tier 3 |
Surface hole is not to be intentionally deviated due to risk of severe casing wear during drilling of vertical and curve sections. ๐ Suspension of Drilling Sundry Form and Permit Stipulations Explicit operational constraint driven by casing wear concerns, not a routine regulatory requirement. Indicates specific geomechanical or historical challenges in the area. |
Unknown | Directional Drilling |