| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Approximate proposed start date for drilling (spud) provided as '2/16/2026' in the suspension of drilling request.โฐ TIME-SENSITIVE ๐ Sundry Form for Suspension of Drilling Description Operator provides a forward-looking spud date (~9 months from filing). This signals planned timing for the initial surface hole drilling operation. |
2026-02-16 | General Oilfield Services |
| Tier 3 |
Operator requested and received approval for suspension of drilling operations for up to 90 days after spudding surface hole with a smaller rig, with explicit condition to plug and abandon if not drilled by larger rig within 90 days.โฐ TIME-SENSITIVE ๐ Sundry Form for Suspension of Drilling (FORM ID: 247095) Reveals a staged drilling approach to save costs, using a small rig for surface hole then a larger rig for TD. Creates a hard 90-day window for the larger rig to mobilize and drill, or face P&A liability. This is a non-routine operational strategy with strict timing constraints. |
2025-05-16 | Drilling Rigs |
| Tier 3 |
Surface hole is 'not to be intentionally deviated' due to 'possibility of severe casing wear'. This is stated in both the suspension of drilling sundry and the permit conditions. ๐ Sundry Form for Suspension of Drilling and Permit Conditions Explicit prohibition on deviating the surface hole, driven by casing wear concerns. This is a specific design constraint not found in all permits. |
2025-05-16 | Directional Drilling |
| Tier 3 |
Operator requested and received waiver for open hole logs, relying on offset well HICKEL 15-35H (NDIC# 19066) within a mile, and will only run a GR-CBL from TD to ground level. ๐ Sundry Form for Open Hole Log Waiver (FORM ID: 247103) Deviates from standard logging requirements, indicating high confidence in subsurface data from offset. Reduces logging scope and associated vendor services. |
2025-05-12 | Regulatory / Permitting |
| Tier 3 |
Approved permit includes stipulation: 'Operators shall not commence operations on a drill site until the 3rd business day following publication of the approved drilling permit on the NDIC - OGD Daily Activity Report.' Waiver possible by Director.โฐ TIME-SENSITIVE ๐ Permit Stipulations - Conditions of Approval Imposes a mandatory 3-business-day waiting period after permit publication before operations can start, unless a waiver is granted. This controls the pace of mobilization. |
2025-05-12 | Regulatory / Permitting |
| Tier 3 |
Approved permit includes stipulation: 'Hess must contact NDIC Field Inspector Robert Stafford at 701-946-8204 prior to location construction.' ๐ Permit Stipulations - Construction Commencement Notification Specific, named field inspector must be contacted before pad construction begins. This is a pre-construction regulatory checkpoint. |
2025-05-12 | General Oilfield Services |