| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator requested and received approval for suspension of drilling for up to 90 days after surface casing set. Plan: drill surface hole with small rig, set casing, plug, then move off. Larger rig to return within 90 days to complete well. Approximate start date 2/16/2026.โฐ TIME-SENSITIVE ๐ Sundry Form ID 247094 - Suspension of Drilling Unusual two-rig strategy to save cost/time. Creates a defined 90-day window for larger rig mobilization and completion drilling. Failure to resume within 90 days triggers P&A obligation. |
2026-02-16 | Drilling Rigs |
| Tier 3 |
Cement Bond Log review revealed cement shortfall. Log dated 2/14/26 but not received by regulator until 6/1/26, indicating a significant delay in regulatory submission. ๐ Notice of Violation letter 3.5-month delay between log date and regulatory receipt suggests possible operational or administrative lag. Highlights regulatory compliance timing risk. |
2026-06-01 | General Oilfield Services |
| Tier 3 |
State Geologist mandated specific cuttings and core collection protocol: samples from Base of Last Charles Salt, 30 intervals in vertical/build, 200 in lateral, shipped within 30 days of drilling completion. Cores within 180 days. ๐ Letter from Ross Edison, State Geologist Non-routine, detailed sampling mandate with strict deadlines. Indicates geological interest or regulatory requirement for this area. |
2025-05-19 | General Oilfield Services |
| Tier 3 |
Open hole log waiver approved based on offset well HICKEL 15-35H (NDIC# 19066) within a mile. Only GR-CBL from TD to surface required. ๐ Sundry Form ID 247101 - Open Hole Log Waiver Operator avoids full open hole logging suite, reducing logging costs and time. Relies on offset data, indicating confidence in geological predictability. |
2025-05-12 | Regulatory / Permitting |
| Tier 3 |
Notice of Violation issued for insufficient cement isolation of Dakota Group (Newcastle Formation). Top of cement at 5109 ft vs. formation top at 5018 ft. Requires continuous annulus pressure monitoring with โค300 psi gauge and frac string prior to hydraulic fracture stimulation. ๐ Notice of Violation letter from ND Oil and Gas Division Regulatory non-compliance creates immediate remediation requirement and alters completion design. Forces operator to install and monitor annulus pressure gauge and run a frac string, adding cost and complexity. |
Unknown | Completions / Frac |