๐Ÿ›ข๏ธ Owan Trust North 29-28-27F 1H

Devon Energy Williston, LLC ยท Williams County, ND ยท File #41908 ยท Generated 2026-05-04 01:55

API
3310506569
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 100% of lateral drilled within Middle Bakken target zone with no upper or lower shale strikes, maintaining near-base positioning.
๐Ÿ“„ Geological Summary: 'The lateral was drilled 100% inside the Middle Bakken formation with no lower or upper shale strikes. Through the course of the lateral 97% took place in the targeted zone... mainly focusing on maintaining a location near the base of the target zone.'
Exceptional geo-steering precision in a challenging formation, indicating advanced directional drilling capabilities or contractor expertise.
2025-12-18 Directional Drilling
Tier 3 Operator obtained a backbuild order waiver to drill outside the target spacing unit, self-notifying as adjacent operator.
๐Ÿ“„ Letter dated April 29, 2025, SUBJECT: Owan Trust North (Owan Trust North 29-28-27 1H, 2H, 3H, 4H) - Backbuild Order Waiver
Demonstrates proactive regulatory strategy to enable multi-well pad development across spacing units without external notifications, potentially accelerating permitting and operations.
2025-04-29 Regulatory / Permitting
Tier 3 Well designed with a wet shoe sub and ability to frac out the toe, allowing for toe fracturing without traditional plug-and-perf.
๐Ÿ“„ PROPOSED DRILLING PLAN section: 'Devon Energy Williston, L.L.C will utilize a wet shoe with ability to frac out the toe.'
Non-standard completion design choice that enables alternative fracturing methods, potentially reducing operational complexity or costs in lateral sections.
Relative Completions / Frac
Tier 3 Commitment to no diesel-based compounds in hydraulic stimulation, listing specific CAS numbers to avoid.
๐Ÿ“„ STIMULATION section: 'The Operator will not use any of the below listed diesel based compounds in the Hydraulic Stimulation of this well.'
Regulatory-compliant choice to avoid environmentally sensitive additives, potentially influencing frac fluid vendors and environmental monitoring.
Relative Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Geo-steering and mudlogging
Services commenced December 15, 2025, at 9,050' MD, aligning with vertical to curve transition; opportunities for contractors like Core Geologic in upcoming Bakken horizontals.
Drill cuttings disposal and environmental services
Closed-loop system utilized throughout drilling to TD December 21, 2025; Secure Energy Services positioned for waste handling in pad operations.
Advanced completion tools (e.g., wet shoe systems)
Design enables toe fracturing post-TD; timing post-December 21, 2025, for completion phases, signaling demand for specialized frac tools.