| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes specific east setback condition based on a production liner cemented in lateral with a wet shoe and ability to frac out the shoe. ๐ PERMIT INFORMATION - Stipulations section Non-standard setback justification tied to a specific completion design (wet shoe) and frac-out capability. |
2025-05-13 | Completions / Frac |
| Tier 3 |
Waiver granted for vertical drill cutting sample collection due to prior collection on pad sibling well (41908). ๐ WELL SUNDRY FORM - Request for Consideration/Waiver Regulatory precedent set for pad development; reduces sampling burden and cost for subsequent wells on the same pad. |
2026-01-29 | Regulatory / Permitting |
| Tier 3 |
Operator proactively submitted 'Backbuild Order Waiver' letter stating Devon is also the operator of the adjacent spacing unit the wellbore traverses. ๐ Devon Energy Corporation letter dated April 29, 2025 Demonstrates strategic land/unit control and regulatory foresight. Waiver eliminates notification requirement to other operators. |
2025-04-29 | Regulatory / Permitting |
| Tier 3 |
Two sidetracks required due to Upper and Lower Bakken Shale strikes, with lateral only 72% in target zone. ๐ Geological Summary - Horizontal Wellbore section Significant geological steering challenges encountered, requiring multiple sidetracks and resulting in sub-optimal lateral placement. |
2025-11-12 to 2025-11-18 | Directional Drilling |
| Tier 3 |
Drilling plan explicitly states stimulation will NOT use diesel-based compounds, listing specific CAS numbers to be avoided. ๐ PROPOSED DRILLING PLAN - Stimulation section Pre-emptive, explicit prohibition of specific stimulation chemicals, likely for environmental/regulatory compliance. |
Relative | General Oilfield Services |