| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Variance to NDAC 43-02-03-21 for tubing/packer requirement, with assurances on casing burst rating, monitoring, and fluid properties to ensure safety without packer. ๐ Sundry Form for Well File No.: 41912, Tubing/Packer Waiver Non-standard completion design relying on casing integrity and real-time monitoring instead of packer, exposing a risk-mitigated approach to high-pressure operations. |
2025-05-21 | General Oilfield Services |
| Tier 2 |
Request for suspension of drilling operations for up to 90 days to use a smaller rig for surface hole and casing, followed by a larger rig for completion, citing cost and time savings without altering lease obligations.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 41912, DESCRIPTION (OPERATOR), Suspension of Drilling Non-routine post-spud suspension to switch rig sizes, revealing intent to optimize initial drilling costs while maintaining a strict 90-day completion window to avoid abandonment. |
2025-05-21 | Drilling Rigs |
| Tier 2 |
Stimulation plan excludes diesel-based compounds (CAS numbers listed), using a wet shoe with frac-out capability. ๐ 5. STIMULATION Specifies chemical exclusions for environmental compliance, with toe sleeve design for frac initiation, revealing a tailored stimulation strategy. |
Unknown | Completions / Frac |
| Tier 3 |
Waiver for open hole logs, using logs from offsetting well Scha 33-34 3H (NDIC File #22605) within a mile, with GR-CBL from TD to ground level. ๐ Sundry Form for Well File No.: 41912, Open Hole Log Waiver Relies on nearby well data for formation tops, avoiding redundant logging and indicating clustered development leveraging existing subsurface intelligence. |
2025-05-21 | Regulatory / Permitting |
| Tier 3 |
Waiver for filter sock container requirement, as operator does not use filter media during drilling process. ๐ Sundry Form for Well File No.: 41912, Filter Sock Container Waiver Indicates a mud system design that avoids filtration, potentially using alternative fluid management, differing from standard NDAC 43-02-03-19.2 compliance. |
2025-05-21 | Mud / Fluids |
| Tier 3 |
Requirement for closed mud system with no cuttings pit, remote or automatic shutoff devices, and specific safety considerations for simultaneous operations per NDAC 43-02-03-28. ๐ Conditions of Approval, Stipulation Mandates advanced environmental and safety equipment, reflecting regulatory-driven design choices for multi-well pads. |
2025-05-14 | Mud / Fluids |
| Tier 3 |
Mandatory prior written notice to adjacent operators (e.g., EOG Resources Inc.) for hydraulic fracturing within 2,640 feet, including 21-31 day notice and emergency contacts. ๐ OPERATOR ASSERTIONS, Well Information Enforces inter-operator coordination for frac operations, indicating potential for scheduling conflicts or partnerships in dense spacing units. |
Relative | Completions / Frac |