โ† Back to Daily Permits

๐Ÿ›ข๏ธ SCHA 33-34 5H

Devon Energy Williston, LLC ยท Mountrail County, ND ยท File #41913 ยท Generated 2026-04-20 02:25

API
3306105527
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Use of closed mud system with cuttings hauled to Prairie Disposal, and stimulation by Grayson Mill Operating with wet shoe frac-out capability
๐Ÿ“„ Mud Program and Stimulation sections
Specifies environmental compliance via closed loop and toe frac design, differing from open pit norms and standard dry shoes
Relative Mud / Fluids
Tier 3 Waiver for collection of drill cutting samples in vertical portion, citing prior collection on pad well SCHA 33-34 XN 1Hโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form, approved 01/29/2026
Non-standard regulatory choice to skip vertical sampling, relying on offset data, which is unusual for full geological characterization
2026-01-29 Regulatory / Permitting
Tier 3 Permit modification to change target formation from Three Forks to Middle Bakken, adjust BHL to 2110' FNL & 150' FEL, and ITP to 2110' FNL & 150' FWL
๐Ÿ“„ Permit Modification section, submitted 12/17/2025, approved 01/05/2026
Indicates a mid-planning shift in geological targeting, potentially due to updated subsurface data or economic optimization, deviating from initial Three Forks focus
2025-12-17 General Oilfield Services
Tier 3 Well name change from SCHA 33-34 5TFH to SCHA 33-34 5H
๐Ÿ“„ Sundry Form, effective 10/02/2025
Reflects alignment with formation change, as 'TFH' likely denoted Three Forks Horizontal, now updated to generic '5H'
2025-10-02 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days to set surface casing with smaller rig before full TD rig move-onโฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form, approved 05/29/2025
Pre-spud approval for phased drilling, allowing cost-efficient surface work ahead of lateral drilling
2025-05-29 Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and geosteering
Active during curve/lateral drilling from January 19-23, 2026, with 100% target window success, signaling immediate demand for MWD services like Badger
Hydraulic stimulation
Post-drilling completion, with Grayson Mill's wet shoe design enabling toe frac, creating urgency for frac vendors as well nears awaiting completion status
Waste disposal
Ongoing during drilling, with closed system requiring haul to Prairie Disposal, offering sustained opportunities for environmental services