โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-Barb 157-97-3523H-5

Hess Bakken Investments II, LLC ยท Williams County, ND ยท File #41919 ยท Generated 2026-05-01 02:19

API
33-105-06573
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (3)

Tier Signal Date Service Impact
Tier 3 Request for suspension of drilling operations for up to 90 days to use smaller rig for surface hole, approved by NDIC.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41919 - Request for Consideration/Waiver Suspension of Drilling
Non-standard drilling sequence allowing cost savings by deferring large rig mobilization, with specific conditions on casing and plug placement.
2025-05-21 Drilling Rigs
Tier 3 Waiver for open hole logs, justified by offsetting well Hickel 15-35H within 1 mile, approved by NDIC.
๐Ÿ“„ Sundry Form for Well File No. 41919 - Open Hole Log Waiver
Deviation from standard logging requirements, relying on nearby well data, which is not routine for new wells.
2025-05-19 Regulatory / Permitting
Tier 3 MWD survey conducted over extended period from September 21 to December 15, 2025, with multiple runs.
๐Ÿ“„ Directional Survey Certification and MWD Survey Report
Prolonged survey timeline post-spud, indicating possible operational challenges or phased drilling.
2025-09-21 to 2025-12-15 Drilling Rigs

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling rigs
Small rig needed immediately for surface hole starting October 18, 2025, followed by large rig within 90 days; creates urgent opportunity for rig contractors.
MWD and directional surveying
Extended survey period from September to December 2025 indicates sustained need for surveying services post-spud.