๐Ÿ›ข๏ธ GO-Lemire 157-97-3613H-1

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #41921 ยท Generated 2026-05-01 02:20

API
33-105-06575
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Pad cement stabilization completed post-spud, as part of environmental compliance.
๐Ÿ“„ Sundry Notice for Location Stabilization
Non-routine environmental remediation step after initial construction, tied to landowner agreement signed in 2024.
2025-06-26 General Oilfield Services
Tier 3 Approval for suspension of drilling operations for up to 90 days to use a smaller rig for surface casing before bringing in a larger rig for total depth drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Notice for Suspension of Drilling
Non-standard drilling sequence to optimize costs by using smaller equipment initially, with a 90-day window for rig mobilization.
2025-05-21 Drilling Rigs
Tier 3 Waiver granted for open hole logs, relying on offsetting well data for formation tops.
๐Ÿ“„ Sundry Notice for Open Hole Log Waiver
Deviation from standard logging requirements, citing proximity to existing logged well.
2025-05-19 Regulatory / Permitting
Tier 3 Requirement for onsite inspection due to aquifer location, including closed mud system and impermeable liner.
๐Ÿ“„ Permit Stipulations
Special regulatory conditions for groundwater protection in aquifer area.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and Directional Services
Spud scheduled for August 2025, with potential 90-day suspension window; rig transition from Nabors small rig to larger rig signals immediate opportunity for directional and MWD contractors like Noble and Gordon.
Environmental and Remediation Services
Cement stabilization completed June 2025, but aquifer stipulations require ongoing mud system management; potential for filter sock disposal waivers if no filtration used.