| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Pad cement stabilization completed post-spud, as part of environmental compliance. ๐ Sundry Notice for Location Stabilization Non-routine environmental remediation step after initial construction, tied to landowner agreement signed in 2024. |
2025-06-26 | General Oilfield Services |
| Tier 3 |
Approval for suspension of drilling operations for up to 90 days to use a smaller rig for surface casing before bringing in a larger rig for total depth drilling.โฐ TIME-SENSITIVE ๐ Sundry Notice for Suspension of Drilling Non-standard drilling sequence to optimize costs by using smaller equipment initially, with a 90-day window for rig mobilization. |
2025-05-21 | Drilling Rigs |
| Tier 3 |
Waiver granted for open hole logs, relying on offsetting well data for formation tops. ๐ Sundry Notice for Open Hole Log Waiver Deviation from standard logging requirements, citing proximity to existing logged well. |
2025-05-19 | Regulatory / Permitting |
| Tier 3 |
Requirement for onsite inspection due to aquifer location, including closed mud system and impermeable liner. ๐ Permit Stipulations Special regulatory conditions for groundwater protection in aquifer area. |
Unknown | Mud / Fluids |