๐Ÿ›ข๏ธ GO-Lemire 157-97-3613H-2

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #41922 ยท Generated 2026-05-01 02:20

API
3310506576
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Request for suspension of drilling operations for up to 90 days to use a smaller freshwater-based rig for surface casing before moving on a larger rig for TD completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No. 41922 - Suspension of Drilling
Non-standard drilling sequence to optimize costs and time by avoiding larger rig mobilization for initial surface hole, with specific freshwater mud requirement and no saltwater use.
2025-05-21 Mud / Fluids
Tier 3 Waiver request for open hole logs, citing sufficient logs from offsetting well B HICKEL 15-35H within a mile, with GR-CBL planned from TD to surface.
๐Ÿ“„ Sundry Form for Well File No. 41922 - Request for Consideration/Waiver - Open Hole Log Waiver
Deviation from standard NDIC Rule 43-02-03-31 requiring open hole logs, relying on nearby well data instead of running full suite.
2025-05-19 Regulatory / Permitting
Tier 3 Anti-collision standards exceeding NDIC minimums, including 1.5 separation factor for planning, real-time corrected surveys, and gamma ray geo-steering.
๐Ÿ“„ Permit Application - Anti-Collision Statement
Proactive anti-collision measures beyond regulatory requirements, indicating heightened risk awareness in densely drilled area.
2025-05-15 Directional Drilling
Tier 3 Surface use agreement executed for off-lease drilling into adjacent spacing units, including Sections 23, 26, and 35.
๐Ÿ“„ Affidavit - Surface Use Agreement
Enables drilling outside primary spacing unit, requiring coordination with adjacent operators like Silver Hill and Chord Energy.
2025-04-22 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
Permit approved May 2025 with spud planned August 2025; anti-collision requirements demand advanced surveying, creating immediate opportunity for Noble and Gordon pre-mobilization.
Rig mobilization and cementing
Suspension approved May 2025 with proposed start October 2025; smaller rig for surface hole followed by larger rig, signaling phased service needs and cementing specs.