โ† Back to Daily Permits

๐Ÿ›ข๏ธ GO-Lemire 157-97-3613H-3

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #41923 ยท Generated 2026-04-16 01:46

API
33-105-06577
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Spud date notification and cementing details provided.โฐ TIME-SENSITIVE
๐Ÿ“„ Notification of Work Performed Sundry Form
Early spud in August, ahead of some approvals, signaling urgency in project timeline.
2025-08-26 General Oilfield Services
Tier 3 Suspension of drilling for up to 90 days to use smaller rig for surface hole, then move to larger rig for completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Suspension of Drilling Sundry Form
Non-standard drilling sequence to optimize costs by using smaller rig initially, indicating operational flexibility and cost-saving strategy.
2025-05-21 Drilling Rigs
Tier 3 Waiver for open hole logs granted due to offsetting well with sufficient logs.
๐Ÿ“„ Open Hole Log Waiver Sundry Form
Deviation from standard logging requirements, relying on nearby well data, suggesting efficiency in regulatory compliance.
2025-05-19 Regulatory / Permitting
Tier 3 Directional surveys conducted over multiple runs in October-November 2025.
๐Ÿ“„ Directional Survey Certification and MWD Survey Reports
Extended survey period post-spud, indicating complex directional drilling requiring multiple MWD runs.
2025-10-09 to 2025-11-01 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and directional services
Spud in August 2025, with surveys in October-November 2025, creating immediate demand for rig mobilization and MWD operations.
Logging and cementing
Post-spud cementing and GR-CBL logging required soon after spud, with waiver reducing open hole logging needs.
Completion and stimulation
Horizontal liner installation and frac operations planned after drilling, with Halliburton pre-selected for stimulation.