| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Spud date notification and cementing details provided.โฐ TIME-SENSITIVE ๐ Notification of Work Performed Sundry Form Early spud in August, ahead of some approvals, signaling urgency in project timeline. |
2025-08-26 | General Oilfield Services |
| Tier 3 |
Suspension of drilling for up to 90 days to use smaller rig for surface hole, then move to larger rig for completion.โฐ TIME-SENSITIVE ๐ Suspension of Drilling Sundry Form Non-standard drilling sequence to optimize costs by using smaller rig initially, indicating operational flexibility and cost-saving strategy. |
2025-05-21 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs granted due to offsetting well with sufficient logs. ๐ Open Hole Log Waiver Sundry Form Deviation from standard logging requirements, relying on nearby well data, suggesting efficiency in regulatory compliance. |
2025-05-19 | Regulatory / Permitting |
| Tier 3 |
Directional surveys conducted over multiple runs in October-November 2025. ๐ Directional Survey Certification and MWD Survey Reports Extended survey period post-spud, indicating complex directional drilling requiring multiple MWD runs. |
2025-10-09 to 2025-11-01 | Directional Drilling |