| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Defect in 6th 7" casing with 38% wall loss; ran 4-1/2" frac string as preventative measure prior to frac operations. ๐ Supplemental Information - WELL SUNDRY FORM Unexpected casing issue leading to additional frac string installation, altering completion design. |
2026-01-28 | Completions / Frac |
| Tier 3 |
MWD survey conducted from October 13 to 28, 2025, with certification dated October 1, 2025.โฐ TIME-SENSITIVE ๐ Directional Survey Certification and MWD Survey Report Extended survey period post-spud, indicating detailed directional control. |
2025-10-01 | Directional Drilling |
| Tier 3 |
Request for suspension of drilling for up to 90 days to use smaller rig for cost and time savings, approved by NDIC.โฐ TIME-SENSITIVE ๐ Request for Consideration/Waiver - Suspension of Drilling Non-standard drilling sequence allowing smaller rig for initial surface hole, potentially delaying larger rig mobilization. |
2025-05-27 | Drilling Rigs |
| Tier 3 |
Waiver requested for open hole logs, citing sufficient logs from offsetting well within a mile. ๐ Open Hole Log Waiver Deviation from standard logging requirements, relying on nearby well data. |
2025-05-19 | Regulatory / Permitting |