| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Tubing/Packer waiver approved based on casing design and completion safety assurances, allowing completion without standard tubing/packer. ๐ WELL SUNDRY FORM - Tubing/Packer Waiver Regulatory variance from standard completion design, indicating a tailored, risk-managed approach that may affect completion service and equipment scope. |
2025-12-09 | Regulatory / Permitting |
| Tier 3 |
Waiver granted for open hole logs, relying on offset well Owan Trust South 32-33-34F 4H (File #41949) logs within a mile. ๐ WELL SUNDRY FORM - Open Hole Log Waiver Regulatory approval to skip standard open hole logging, indicating operator confidence in offset data and a potential cost-saving design choice that reduces logging vendor opportunity on this specific well. |
2026-01-29 | Regulatory / Permitting |
| Tier 3 |
Waiver granted for drill cutting samples in vertical portion (Base of Last Salt to KOP), citing samples already collected from pad well Owan Trust South 32-33-34F 1H (File #41946). ๐ WELL SUNDRY FORM - Drill Cutting Samples Waiver Regulatory approval to skip vertical cuttings sampling, indicating a pad-level sampling strategy that reduces service scope for mudlogging/sample collection on individual wells. |
2026-01-29 | Mud / Fluids |
| Tier 3 |
Suspension of Drilling approved for up to 90 days to use a smaller rig for surface hole, then move off and return with larger rig within 90 days.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Suspension of Drilling Operator plans a two-rig strategy: spud with Noble #1 rig for surface casing, then suspend and bring larger rig later. This creates a distinct, time-bound service window for both rig types and associated services. |
2025-12-16 | Drilling Rigs |
| Tier 3 |
Waiver granted for filter sock container requirement for drilling phase only, as operator states they do not use filter media during drilling. ๐ WELL SUNDRY FORM - Filter Sock Container Waiver Regulatory exemption from a standard waste container requirement, indicating a non-routine operational choice (no filter media use) that affects waste management vendors. |
2025-12-16 | Regulatory / Permitting |
| Tier 3 |
Surface hole spudded on 2025-12-04 using Noble #1 rig, as per suspension of drilling plan. ๐ WELL SUNDRY FORM - Notification of Work Performed (Spud Date) Confirms execution of the two-rig strategy, initiating the first phase with the smaller Noble #1 rig. |
2025-12-04 | Drilling Rigs |
| Tier 3 |
Drilling plan specifies disposal of all drill cuttings to Secure Energy Services at 13809 66th St NW, Williston ND. ๐ PROPOSED DRILLING PLAN - DISPOSAL OF DRILL CUTTINGS Explicitly names a licensed disposal facility for all cuttings, indicating a pre-selected waste hauling and disposal vendor. |
Unknown | General Oilfield Services |