๐Ÿ›ข๏ธ Owan Trust South 32-33-34F 3H

Devon Energy Williston, L.L.C. ยท Williams County, ND ยท File #41948 ยท Generated 2026-08-22 00:22

API
3310506599
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Operator secured multiple regulatory waivers simultaneously: open hole log waiver, vertical sample waiver, filter sock container waiver, and tubing/packer waiver.
๐Ÿ“„ Multiple Sundry Forms (Form IDs: 295023, 295006, 287005, 287023)
Demonstrates a proactive, batch approach to regulatory streamlining for a multi-well pad, reducing operational overhead and standardizing procedures.
2025-12-09 to 2026-01-27 Regulatory / Permitting
Tier 2 Operator used a 'wet shoe' completion design for the production liner with ability to 'frac out the toe', and included a backup hydraulic toe sleeve.
๐Ÿ“„ Proposed Drilling Plan / Casing Schematic
Specific engineered completion design choice (wet shoe) with a redundant backup system indicates a focus on ensuring lateral access for stimulation.
Unknown Completions / Frac
Tier 3 Landing target was adjusted twice during the curve: first after logging Lodgepole top, then a 5' downward adjustment via a 'landing target adjustment' issued.
๐Ÿ“„ Geological Summary
Shows active, real-time geosteering and target refinement during drilling, not just following a static plan.
2026-01-20 General Oilfield Services
Tier 3 Operator requested and received a 90-day suspension of drilling after spudding surface hole with a smaller rig (Noble #1) to save costs, with plan to return with larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form - Suspension of Drilling (Form ID: 287010)
Reveals a staged drilling approach to optimize rig costs, creating a defined 90-day window for service providers before main drilling operations resume.
2025-12-02 Drilling Rigs
Tier 3 Operator notified adjacent unit operator (itself) per NDIC orders, stating wellbores will traverse outside the target spacing unit.
๐Ÿ“„ Letter from Yani Durden to NDIC dated May 8, 2025
Confirms extended-reach drilling crossing unit boundaries, which has regulatory notification requirements and implies longer laterals or complex pad planning.
2025-05-08 General Oilfield Services
Tier 3 Drill cuttings disposal contract explicitly named: 'Secure Energy Services located at 13809 66th St NW, Williston ND 58801'.
๐Ÿ“„ Proposed Drilling Plan - Disposal of Drill Cuttings
Rare explicit naming of a waste disposal vendor and address in a well plan.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rig Services
Two-phase rig approach creates opportunity: smaller rig for surface holes on pads, larger rigs for main drilling. The 90-day suspension creates a predictable remobilization window.
Advanced Geosteering & Real-Time Geology
Operator demonstrated active steering adjustments. High in-zone percentage (89%) is a key performance metric, creating demand for high-quality formation evaluation and steering services.
Regulatory & Permitting Consulting
Operator's batch waiver strategy shows value in proactively managing regulatory requirements for multi-well pads, a serviceable need for other operators.
Waste Management / Cuttings Disposal
Explicit long-haul disposal contract named (Secure Energy Services). Competitors can target future pads or attempt to displace on contract renewal.
Completion & Stimulation Services
Wet shoe design with planned frac-out indicates specific completion operational needs. The pad has multiple wells, suggesting a larger, sequenced frac campaign opportunity.