| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver for tubing/packer requirement, using safety factors and monitoring for casing integrity during completion. ๐ WELL SUNDRY FORM - Tubing/Packer Waiver Non-standard completion design to optimize casing use without packer. |
2025-06-09 | Regulatory / Permitting |
| Tier 2 |
Backbuild order waiver for horizontal drilling outside target spacing unit, with Devon as adjacent operator. ๐ Letter from Devon Energy Corporation dated April 1st, 2025 Self-notification waiver for backbuild, enabling pad development across units. |
2025-04-01 | Directional Drilling |
| Tier 3 |
Waiver requested for collection of drill cutting samples in vertical portion from Base of Last Salt to curve kick off point, with samples collected from Thunderbolt 10-12 1H used instead. ๐ WELL SUNDRY FORM - Drill Cutting Samples Waiver Non-standard waiver to avoid redundant sampling on a multi-well pad, potentially reducing costs and time. |
2026-01-30 | Regulatory / Permitting |
| Tier 3 |
Waiver for filter sock container requirement, as operator does not use filter media during drilling. ๐ WELL SUNDRY FORM - Filter Sock Container Waiver Regulatory exemption based on drilling practices, avoiding unnecessary compliance costs. |
2025-06-12 | Regulatory / Permitting |
| Tier 3 |
Suspension of drilling for up to 90 days to use smaller rig for surface hole, then move to larger rig for full drilling.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Suspension of Drilling Unusual phased drilling approach to leverage cost savings from smaller equipment. |
2025-06-11 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs, citing sufficient logs from offsetting well Myron 9-4 3H within a mile. ๐ WELL SUNDRY FORM - Open Hole Log Waiver Reliance on nearby well data to skip logging, reducing operational expenses. |
2025-06-06 | Regulatory / Permitting |