๐Ÿ›ข๏ธ AMBER 2133-1BH

KODA Resources Operating, LLC ยท Divide County, ND ยท File #41974 ยท Generated 2026-04-24 02:11

API
3302301626
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Request to monitor surface pressure of production casing annulus in lieu of cement squeeze for Newcastle formation isolation, pursuant to NDAC 43-02-03-21, with 300 psi gauge, buried but accessible valves, and NDIC inspector presence; formation to be squeezed upon abandonment.
๐Ÿ“„ Sundry Form for Well File No. 41974
Deviates from standard immediate cement squeeze for formation isolation, opting for monitored deferral until abandonment.
2026-03-10 General Oilfield Services
Tier 3 Sidetrack performed from 4644 ft to 24676 ft MD, with checkshot surveys confirming trajectory adjustments.
๐Ÿ“„ Drilling Operations Report
Involves intentional wellbore redirection post-initial drilling.
2025-12-19 Directional Drilling
Tier 3 Waiver request for open hole logs, justified by reliance on offset well Amber 2104-5BH within 1 mile for formation tops; GR-CBL to be run from TD to surface.
๐Ÿ“„ Sundry Form for Well File No. 41974
Avoids full open hole logging suite, using adjacent well data instead.
2025-11-12 Drilling Rigs
Tier 3 Multiple drilling challenges including lost circulation, pressure/torque spikes, excessive shale cuttings, mud weight increases to 10.8 PPG, and LCM additions; wiper trips and reaming required.โฐ TIME-SENSITIVE
๐Ÿ“„ Drilling Operations Report
Recurring operational issues in vertical and lateral sections, beyond standard drilling.
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Annulus monitoring and pressure gauge installation
Immediate opportunity post-sundry approval (March 2026) for gauge suppliers and monitoring services to enable completion without squeeze.
Directional drilling and surveying
Ongoing during drilling phases (December 2025) with KLX, including sidetrack and survey verification for trajectory accuracy.
Cementing and remedial cementing
Urgent during casing and liner installation (late 2025/early 2026) with MAGNUM and AMERICAN CEMENTERS, given noted cementing challenges.
Wireline services for logging and isolation
Post-drilling (early 2026) with GO and SUREFIRE for cement evaluation and bridge plug operations to support completion.