| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Tubing/packer waiver approved, with assurances on casing integrity and monitoring. ๐ SUNDRY FORM FOR WELL FILE NO.: 41978 - Tubing/Packer Waiver Deviation from standard tubing requirements, indicating operator confidence in casing design for flowback without additional barriers. |
2025-09-24 | Regulatory / Permitting |
| Tier 3 |
Use of Reed RH54-H1 6โ drill bit and Baker mud motor in lateral drilling. ๐ Geological Summary - Horizontal Wellbore Specific vendor selection for BHA components, differing from standard practices. |
2025-11-22 | Mud / Fluids |
| Tier 3 |
Assisted steering with Starsteer software program. ๐ Geological Summary - Horizontal Wellbore Use of proprietary software for real-time wellbore placement, enhancing precision in target facies. |
2025-11-22 | Directional Drilling |
| Tier 3 |
Cuttings collected at 30' intervals in vertical/curve and 200' in lateral, with specific gas and fluorescence analysis. ๐ Geological Summary Detailed sampling protocol beyond basic requirements, indicating focus on geological optimization. |
2025-11-19 | General Oilfield Services |
| Tier 3 |
Waiver granted for filter sock container during drilling phase only, citing no use of filter media. ๐ SUNDRY FORM FOR WELL FILE NO.: 41978 - Filter Sock Container Waiver Non-standard exemption from regulatory requirement for waste containment, potentially reducing operational costs or simplifying logistics. |
2025-09-26 | Regulatory / Permitting |