โ† Back to Daily Permits

๐Ÿ›ข๏ธ LC Rambousek 1-9H

Murfin Drilling Company, Inc. ยท Dunn County, North Dakota County, ND ยท File #41983 ยท Generated 2026-02-09 17:03

API
33-025-05091-00-00
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Request for waiver to change completion method to include 100' north boundary setback, wet shoe sub with no ability to frac out, allowing pump-down of perforating guns
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 41983 FORM ID: 259763
Non-standard completion design deviates from typical frackable shoe setups, enabling specific pump-down operations and boundary compliance
2025-07-23 Completions / Frac
Tier 3 Lateral drilled in one run, staying within Middle Bakken Dolomite with consistent dolomite samples (coarser upper half, finer lower)
๐Ÿ“„ Geological Summary - Horizontal Wellbore section
Single-run lateral completion suggests efficient drilling without sidetracks, with lithological consistency indicating stable reservoir conditions
2025-07-31 General Oilfield Services
Tier 3 Peak gas of 6621 units in lateral, with average 1628 units and instantaneous ROP up to 550 ft/hr
๐Ÿ“„ Geological Summary - Horizontal Wellbore section
High gas readings and variable ROP indicate hydrocarbon presence and drilling dynamics not evident in basic permit data
2025-07-31 General Oilfield Services
Tier 3 Trip made at 10,881โ€™ MD on 07/29/2025 due to slow build rates, motor and bit replacedโฐ TIME-SENSITIVE
๐Ÿ“„ Geological Summary - Curve section
Unplanned BHA change indicates drilling challenges in curve section, not typical for routine operations
2025-07-29 Directional Drilling
Tier 3 Waiver granted for filter sock container during drilling and completions except drill-out phase
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 41983 FORM ID: 253787
Regulatory waiver allows reduced on-site waste management infrastructure, differing from standard NDIC requirements
2025-06-17 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion services with wet shoe and pump-down technology
Operator's recent waiver approval (July 2025) for wet shoe setup signals immediate opportunity for vendors providing specialized perforating and completion tools
Directional drilling and BHA optimization
Trip due to slow build rates in July 2025 indicates potential need for enhanced directional services to improve curve drilling efficiency
Gas monitoring and ROP management
High gas peaks (up to 6621 units) and variable ROP during lateral drilling (July-August 2025) suggest demand for real-time monitoring tools