← Back to Daily Permits

🛢️ LC Rambousek 1-16H

Murfin Drilling Company, Inc. · Dunn County, ND · File #41984 · Generated 2026-02-06 17:15

API
33-025-05092
Target Formation
Middle Bakken
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 3 Change in completion method to production liner cemented in lateral with wet shoe and no ability to frac out of shoe, enabling 100' setback to south boundary⏱ URGENT
Sundry Form for Well File No. 41984, Form ID: 259765; Permit Stipulations
2025-07-23 Completions / Frac
Tier 3 Waiver for open hole logs, using GR-CBL from offset well LC Rambousek 1-9H instead
Sundry Form for Well File No. 41984, Form ID: 253783
2025-06-17 Regulatory / Permitting
Tier 3 Waiver for filter sock container during drilling and completions except drill-out phase
Sundry Form for Well File No. 41984, Form ID: 253786
2025-06-17 Regulatory / Permitting
Tier 3 Multiple open hole sidetracks in lateral section: pulled back at 19,870' MD and 20,520' MD for re-entry
Geological Summary, Horizontal Wellbore section
Relative Directional Drilling
Tier 3 Mud type transition: Oil Based Mud from surface casing through build section, Saltwater brine for lateral
Well Information, Mud Type
Unknown Mud / Fluids

🎯 Operator Intent

🔧 Service Relevance

Completion Services (wet shoe liner cementing)
Well awaiting completion post-TD on September 14, 2025, with approved design change in July 2025, creating immediate opportunity for cementing contractors specializing in non-frac laterals
Directional and MWD Services
Sidetracks performed in September 2025 indicate ongoing need for precise steering in Middle Bakken, with vendors like Taktikal and Badger already engaged