๐Ÿ›ข๏ธ DROVDAL 5-8 2H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #41986 ยท Generated 2026-08-22 00:26

API
3305310594
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (8)

Tier Signal Date Service Impact
Tier 2 Casing/packer waiver relies on new, high-grade casing (#29 and 32%) with API burst rating assurances and specific monitoring commitments.
๐Ÿ“„ Tubing/Packer Waiver Sundry
Indicates a non-standard completion design (no tubing/packer) justified by premium materials and engineered safety factors.
2025-09-12 Regulatory / Permitting
Tier 2 Operator secured multiple regulatory waivers in advance of spud, including cuttings sample, filter sock, tubing/packer, and open hole log waivers.
๐Ÿ“„ Sundry forms throughout document
Demonstrates proactive regulatory management to streamline operations and reduce non-productive time/costs. Signals a prepared, efficient operator.
2025-09-12 Regulatory / Permitting
Tier 3 Drill cuttings waiver specifically leverages samples from pad-sibling well Drovdal 5-8 XE 1H (File #41990), avoiding redundant sampling.
๐Ÿ“„ Drill Cutting Samples Waiver Sundry
Shows coordinated pad development strategy and regulatory argumentation based on existing data from a nearby well.
2026-01-27 Mud / Fluids
Tier 3 Filter sock container waiver explicitly applies to 'drilling phase only'.
๐Ÿ“„ Additional Sundry Data for Filter Sock Waiver
Waiver is phase-limited, implying filtration may be used during completion/flowback, requiring container compliance later.
2025-09-15 Regulatory / Permitting
Tier 3 Open hole log waiver approved based on offset well data (Loomer State 150-99-5-8 2H, NDIC #24526) within a mile.
๐Ÿ“„ Open Hole Log Waiver Sundry
Eliminates a standard data acquisition requirement, reducing cost and rig time. Shows reliance on established geologic understanding of the area.
2025-09-12 Drilling Rigs
Tier 3 Permit stipulates 'closed mud system with no cuttings pit' and specifies a single, named disposal facility (Ideal Oilfield Disposal, LLC).
๐Ÿ“„ Permit Stipulations and Disposal of Drill Cuttings section
Locks in a specific waste disposal vendor and method, removing competitive bidding for cuttings handling.
2025-06-10 Mud / Fluids
Tier 3 Operator submitted formal notices to XTO Energy Inc. for wells entering adjacent spacing unit, as per Order 31848.
๐Ÿ“„ Sworn statement by Victoria Siemieniewski
Reveals formal inter-operator communication and coordination requirements for pad wells that drill across unit boundaries.
2025-04-15 General Oilfield Services
Tier 3 Mandatory pre-spud notification to specific NDIC Field Inspector Marc Binns (701-220-5989).โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Stipulations
Creates a time-sensitive regulatory checkpoint immediately before construction. Failure to contact delays spud.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Casing & Downhole Tools
Operator's tubing/packer waiver is contingent on using new, high-grade casing (#29 and 32%) with specific API ratings. Premium casing vendors and pressure monitoring equipment providers are critical.
Waste Handling & Disposal
Ideal Oilfield Disposal is contractually locked in for drill cuttings. Other waste vendors are excluded. Filter sock handling post-drilling (completion/flowback) remains a service need.
Directional Drilling & Surveying
Well plan by Prototype Well Planning shows complex trajectory with specific anti-collision concerns. MWD/LWD and directional drilling services are key, especially given the open hole log waiver.
Regulatory & Permitting Support
Operator's pattern of seeking multiple pre-spud waivers indicates value in regulatory consultants who can efficiently navigate NDIC Sundry processes.
Cementing & CBL Services
Permit mandates CBLs on multiple casing strings with zero-pressure passes and specific wait times. Cementing and advanced bond log services are high-priority, time-sensitive requirements.