| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Casing/packer waiver relies on new, high-grade casing (#29 and 32%) with API burst rating assurances and specific monitoring commitments. ๐ Tubing/Packer Waiver Sundry Indicates a non-standard completion design (no tubing/packer) justified by premium materials and engineered safety factors. |
2025-09-12 | Regulatory / Permitting |
| Tier 2 |
Operator secured multiple regulatory waivers in advance of spud, including cuttings sample, filter sock, tubing/packer, and open hole log waivers. ๐ Sundry forms throughout document Demonstrates proactive regulatory management to streamline operations and reduce non-productive time/costs. Signals a prepared, efficient operator. |
2025-09-12 | Regulatory / Permitting |
| Tier 3 |
Drill cuttings waiver specifically leverages samples from pad-sibling well Drovdal 5-8 XE 1H (File #41990), avoiding redundant sampling. ๐ Drill Cutting Samples Waiver Sundry Shows coordinated pad development strategy and regulatory argumentation based on existing data from a nearby well. |
2026-01-27 | Mud / Fluids |
| Tier 3 |
Filter sock container waiver explicitly applies to 'drilling phase only'. ๐ Additional Sundry Data for Filter Sock Waiver Waiver is phase-limited, implying filtration may be used during completion/flowback, requiring container compliance later. |
2025-09-15 | Regulatory / Permitting |
| Tier 3 |
Open hole log waiver approved based on offset well data (Loomer State 150-99-5-8 2H, NDIC #24526) within a mile. ๐ Open Hole Log Waiver Sundry Eliminates a standard data acquisition requirement, reducing cost and rig time. Shows reliance on established geologic understanding of the area. |
2025-09-12 | Drilling Rigs |
| Tier 3 |
Permit stipulates 'closed mud system with no cuttings pit' and specifies a single, named disposal facility (Ideal Oilfield Disposal, LLC). ๐ Permit Stipulations and Disposal of Drill Cuttings section Locks in a specific waste disposal vendor and method, removing competitive bidding for cuttings handling. |
2025-06-10 | Mud / Fluids |
| Tier 3 |
Operator submitted formal notices to XTO Energy Inc. for wells entering adjacent spacing unit, as per Order 31848. ๐ Sworn statement by Victoria Siemieniewski Reveals formal inter-operator communication and coordination requirements for pad wells that drill across unit boundaries. |
2025-04-15 | General Oilfield Services |
| Tier 3 |
Mandatory pre-spud notification to specific NDIC Field Inspector Marc Binns (701-220-5989).โฐ TIME-SENSITIVE ๐ Permit Stipulations Creates a time-sensitive regulatory checkpoint immediately before construction. Failure to contact delays spud. |
Relative | General Oilfield Services |