โ† Back to Daily Permits

๐Ÿ›ข๏ธ DROVDAL 5-8 5H

DEVON ENERGY WILLISTON, L.L.C ยท McKenzie County, ND ยท File #41989 ยท Generated 2026-08-22 00:28

API
3305310597
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Permit includes explicit condition: 'The south setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.'
๐Ÿ“„ PERMIT INFORMATION - Stipulations/Conditions of Approval
Non-standard setback justification tied to specific completion design (wet shoe with frac-out capability). This is a engineered solution to meet spacing requirements.
2025-12-12 Completions / Frac
Tier 2 Operator requested and received variance to tubing/packer requirement, providing seven technical assurances including casing burst rating, safety factors, pressure monitoring, and installation of a 300# gauge on surface casing during flowback.
๐Ÿ“„ WELL SUNDRY FORM - Tubing/Packer Waiver
Detailed engineering justification to waive standard tubing/packer rule, indicating confidence in casing integrity and alternative pressure control methods.
2025-09-12 General Oilfield Services
Tier 3 Operator requested and received waiver for drill cutting samples in vertical portion (Base of Last Salt to curve KOP), citing samples already collected from offset well Drovdal 5-8 XE 1H on same pad.
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver (Drill Cutting Samples Waiver)
Indicates pad-level sampling strategy to reduce redundancy and cost; signals operational efficiency focus and potential for similar waivers on multi-well pads.
2026-01-27 Mud / Fluids
Tier 3 Drilling plan includes intentional deviation in deep-set surface casing starting below minimum surface casing depth (2325' MD), with a 2ยฐ/100' build rate, holding at 19.56ยฐ inclination until KOP.
๐Ÿ“„ PROPOSED WORK section
Non-vertical surface casing section is atypical and requires regulatory approval. Driven by pad geometry and wellbore positioning needs.
2025-12-12 Directional Drilling
Tier 3 Operator notified XTO ENERGY INC. as required by NDIC Order 31848, providing directional plan, trajectory details, and contact information because wellbore enters Bakken outside target spacing unit.
๐Ÿ“„ STATE OF NORTH DAKOTA COUNTY OF MCKENZIE affidavit
Reveals regulatory requirement for inter-operator coordination due to extended-reach lateral crossing into adjacent unit. Shows proactive regulatory compliance and communication with competitor.
2025-12-10 Directional Drilling
Tier 3 Casing wear modeling predicts up to 5% wear below KOP; plan includes running a 40-arm caliper log before installing 9-5/8" Dakota string and installing a wear bushing prior to drilling Dakota section.
๐Ÿ“„ Anticipated Casing Wear section and notes
Proactive wear mitigation plan with specific tools (caliper log, wear bushing) referenced. Model was validated on previous Missouri River wells (Mountrail County, Summer 2024).
2025-12-10 General Oilfield Services
Tier 3 Operator requested and received waiver for filter sock container requirement for drilling phase only, stating 'Devon Energy does not use filter media during the drilling process.'
๐Ÿ“„ WELL SUNDRY FORM - Filter Sock Container Waiver
Explicit operational choice to avoid filtration during drilling, differing from common practice. Waiver granted with phase-specific limitation.
2025-09-12 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
Well requires intentional deviation in surface casing (starting at 2325' MD) with precise build rates and hold angles. MWD surveys required at 100' in vertical, 30' in curve, 90' in lateral. High-precision needed for boundary compliance.
Casing & Cementing Specialists
Complex cementing program with multiple casing strings and specific slurry designs. Wet shoe installation with frac-out capability required for south setback. Casing wear mitigation (wear bushing) needed.
Advanced Logging Services
Multiple CBL requirements (radial or ultrasonic) on surface, intermediate, and production casing. 40-arm caliper log needed before Dakota string installation to validate wear model. GR-CBL required from TD to ground.
Waste Management / Disposal
Closed loop system with cuttings hauled to pre-selected facility (Ideal Oilfield Disposal). No filter media during drilling reduces some waste but cuttings disposal is contracted.
Regulatory & Planning Coordination
Required notification to adjacent operator (XTO) due to lateral crossing unit boundaries. Multiple waiver requests (samples, filter sock, tubing/packer) indicate active regulatory engagement. Need for precise survey submission and certification.