| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit includes explicit condition: 'The south setback is based on a production liner cemented in the lateral with a wet shoe and the ability to frac out the shoe.' ๐ PERMIT INFORMATION - Stipulations/Conditions of Approval Non-standard setback justification tied to specific completion design (wet shoe with frac-out capability). This is a engineered solution to meet spacing requirements. |
2025-12-12 | Completions / Frac |
| Tier 2 |
Operator requested and received variance to tubing/packer requirement, providing seven technical assurances including casing burst rating, safety factors, pressure monitoring, and installation of a 300# gauge on surface casing during flowback. ๐ WELL SUNDRY FORM - Tubing/Packer Waiver Detailed engineering justification to waive standard tubing/packer rule, indicating confidence in casing integrity and alternative pressure control methods. |
2025-09-12 | General Oilfield Services |
| Tier 3 |
Operator requested and received waiver for drill cutting samples in vertical portion (Base of Last Salt to curve KOP), citing samples already collected from offset well Drovdal 5-8 XE 1H on same pad. ๐ WELL SUNDRY FORM - Request for Consideration/Waiver (Drill Cutting Samples Waiver) Indicates pad-level sampling strategy to reduce redundancy and cost; signals operational efficiency focus and potential for similar waivers on multi-well pads. |
2026-01-27 | Mud / Fluids |
| Tier 3 |
Drilling plan includes intentional deviation in deep-set surface casing starting below minimum surface casing depth (2325' MD), with a 2ยฐ/100' build rate, holding at 19.56ยฐ inclination until KOP. ๐ PROPOSED WORK section Non-vertical surface casing section is atypical and requires regulatory approval. Driven by pad geometry and wellbore positioning needs. |
2025-12-12 | Directional Drilling |
| Tier 3 |
Operator notified XTO ENERGY INC. as required by NDIC Order 31848, providing directional plan, trajectory details, and contact information because wellbore enters Bakken outside target spacing unit. ๐ STATE OF NORTH DAKOTA COUNTY OF MCKENZIE affidavit Reveals regulatory requirement for inter-operator coordination due to extended-reach lateral crossing into adjacent unit. Shows proactive regulatory compliance and communication with competitor. |
2025-12-10 | Directional Drilling |
| Tier 3 |
Casing wear modeling predicts up to 5% wear below KOP; plan includes running a 40-arm caliper log before installing 9-5/8" Dakota string and installing a wear bushing prior to drilling Dakota section. ๐ Anticipated Casing Wear section and notes Proactive wear mitigation plan with specific tools (caliper log, wear bushing) referenced. Model was validated on previous Missouri River wells (Mountrail County, Summer 2024). |
2025-12-10 | General Oilfield Services |
| Tier 3 |
Operator requested and received waiver for filter sock container requirement for drilling phase only, stating 'Devon Energy does not use filter media during the drilling process.' ๐ WELL SUNDRY FORM - Filter Sock Container Waiver Explicit operational choice to avoid filtration during drilling, differing from common practice. Waiver granted with phase-specific limitation. |
2025-09-12 | Regulatory / Permitting |