โ† Back to Daily Permits

๐Ÿ›ข๏ธ EN-Edwards-157-94-2203H-1

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #41991 ยท Generated 2026-02-26 18:02

API
3306105535
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Spud date notification with specific time and rig details.โฐ TIME-SENSITIVE
๐Ÿ“„ Notification of Work Performed - Spud Date
Precise timing provided, indicating planned operational start.
2025-08-31 Drilling Rigs
Tier 3 Requirement for cores and samples submission within 30 days of drilling completion.
๐Ÿ“„ RE: CORES AND SAMPLES
Mandates post-drilling data collection, extending operational timeline.
2025-06-16 General Oilfield Services
Tier 3 Request for suspension of drilling operations for up to 90 days to use a smaller rig initially for cost and time savings before moving to a larger rig.
๐Ÿ“„ Sundry Information - Request for Consideration/Waiver - Suspension of Drilling
Non-standard drilling sequence to optimize efficiency and reduce upfront capital expenditure.
2025-06-12 Drilling Rigs
Tier 3 Waiver requested for open hole logs, relying on offsetting well data.
๐Ÿ“„ Sundry Information - Open Hole Log Waiver
Deviation from standard logging requirements, suggesting confidence in regional geology.
2025-06-12 Regulatory / Permitting
Tier 3 Well file marked as confidential, limiting public access to details.
๐Ÿ“„ Page 1 - Confidentiality Notice
Restricts transparency, possibly to protect proprietary designs or timing.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rigs
Suspension period creates a 90-day window for smaller rig availability, followed by larger rig demand starting post-approval.
Cementing Services
Specific cement volumes and types required immediately after spud, with call-in requirement post-bumping plug.