โ† Back to Daily Permits

๐Ÿ›ข๏ธ EN-Edwards- 157-94-2203H-2

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #41992 ยท Generated 2026-02-26 18:03

API
3306105536
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Proposed start date for drilling with small rig: 9/25/2025, with note on surface holes not to be deviated due to casing wear risks.โฐ TIME-SENSITIVE
๐Ÿ“„ Request for Consideration/Waiver - Suspension of Drilling - Description
Specific start timing and deviation restriction reveal operational constraints for vertical sections, not routine.
2025-09-25 Directional Drilling
Tier 3 Spud date notification with specific rig details: Noble Drilling #4, surface casing set at 1,960' (adjusted), with detailed cement volumes and types.
๐Ÿ“„ Notification of Work Performed - Spud Date
Explicit rig assignment and adjusted depths indicate customized drilling plan, not standard permit data.
2025-09-01 Drilling Rigs
Tier 3 Request for suspension of drilling operations for up to 90 days to use a smaller rig for surface hole, citing cost and time savings, with intent to move larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Information - Request for Consideration/Waiver - Suspension of Drilling
Non-standard drilling sequence involving phased rig deployment to optimize costs, not typical for standard Bakken wells.
2025-06-12 Drilling Rigs
Tier 3 Waiver requested for open hole logs, justified by proximity to offsetting well WILL 14-23 (NDIC# 5831) with sufficient logs, and plan for GR-CBL from TD to ground level.
๐Ÿ“„ Sundry Information - Open Hole Log Waiver
Deviation from standard logging requirements, relying on offset data, which may reduce costs but requires regulatory approval.
2025-06-12 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling and Cementing Services
Spud scheduled for 9/1/2025 with Noble Drilling; immediate opportunity for rig support, cementing (ASTM Type III), and monitoring post-spud notifications.
Logging and Directional Services
Waiver approved for open hole logs, but GR-CBL required; timing around drilling phases offers niche for specialized logging contractors.