๐Ÿ›ข๏ธ EN-Will Trust A- 157-94-2734H-4

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #41993 ยท Generated 2026-04-04 16:48

API
3306105537
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Proposed start date for drilling operations with smaller rig.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41993 - Suspension of Drilling
Specific future timing for initial drilling phase, not standard in basic permits.
2025-09-25 Drilling Rigs
Tier 3 Request for suspension of drilling for up to 90 days to use smaller freshwater-based rig for surface hole, followed by larger rig for TD completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form for Well File No.: 41993 - Suspension of Drilling
Non-standard drilling sequence to optimize costs and time by staging rigs, not typical for single-phase drilling.
2025-06-13 Drilling Rigs
Tier 3 Waiver for open hole logs, justified by proximity to offsetting well WILL 14-23 (NDIC# 5831) with sufficient logs.
๐Ÿ“„ Sundry Form for Well File No.: 41993 - Open Hole Log Waiver
Deviation from standard logging requirements, relying on offset data instead of new acquisition.
2025-06-12 Regulatory / Permitting
Tier 3 Use of freshwater-based drilling mud for surface casing, no saltwater, with plug or mechanical seal post-cementing.
๐Ÿ“„ Sundry Form for Well File No.: 41993 - Suspension of Drilling
Environmental compliance choice avoiding saltwater, potentially for groundwater protection or regulatory alignment.
Relative Mud / Fluids
Tier 3 Pad expansion construction using impermeable material for dikes and base, with specific anti-collision standards including 1.5 separation factor.
๐Ÿ“„ Proposed Work - Anti-Collision Statement
Enhanced anti-collision protocols beyond basic requirements, indicating proactive risk management.
Unknown Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling rigs (smaller for surface, larger for TD)
Initial drilling phase scheduled for 9/25/2025, with 90-day window for larger rig; signals immediate opportunity for rig mobilization and potential delays if not met.
Logging and surveying services
Waiver reduces immediate logging needs, but GR-CBL required; survey frequency specified for anti-collision, creating demand for certified surveys post-spud.