| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Spud date set with Noble Drilling #4 rigโฐ TIME-SENSITIVE ๐ Spud Date Notification Selection of specific rig for initial drilling phase |
2025-09-05 | Drilling Rigs |
| Tier 3 |
Hydrotest performed on 6" flex steel pipeline by Loenbro, with calibration by Double EE Service ๐ Hydrotest and Calibration Certificates Specific pre-spud testing of infrastructure, including detailed pressure and temperature data |
2025-08-27 | General Oilfield Services |
| Tier 3 |
Suspension of drilling operations for up to 90 days to use smaller rig for surface hole, with proposed start date 9/25/2025โฐ TIME-SENSITIVE ๐ Sundry Notice for Suspension of Drilling Non-standard drilling sequence involving two rigs to optimize costs, deviating from typical continuous drilling |
2025-06-13 | Drilling Rigs |
| Tier 3 |
Waiver granted for open hole logs due to proximity to offsetting well WILL 14-23 (NDIC# 5831) ๐ Sundry Notice for Open Hole Log Waiver Deviation from standard logging requirements, relying on nearby well data |
2025-06-12 | Regulatory / Permitting |
| Tier 3 |
Anticollision analysis completed with multiple nearby wells, including Level 3 warnings ๐ Anticollision Report Detailed proximity assessments to existing wellbores, some at minimum separation factors |
2025-03-08 | General Oilfield Services |