| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Core and sample collection mandate from the Base of the Last Charles Salt, with strict intervals and shipping deadlines (30 days post-drilling for samples, 180 days for cores).โฐ TIME-SENSITIVE ๐ RE: CORES AND SAMPLES letter A direct, dated regulatory order from the State Geologist specifying exact collection depths, intervals, packaging, and shipping timelines. This is a non-routine compliance burden with financial penalties for violation. |
2025-06-16 | General Oilfield Services |
| Tier 3 |
Explicit regulatory requirement to contact NDIC Field Inspector Will Ryan (701-770-6684) prior to location construction. ๐ Page: 2 of 10, Construction Commencement Notification The permit names a specific field inspector (Will Ryan) and phone number for pre-construction contact. This is a non-routine, personalized regulatory handshake requirement, indicating heightened oversight or specific site conditions (US Forest Service surface owner). |
2025-06-12 | General Oilfield Services |
| Tier 3 |
Stipulation for a fully cemented production liner shoe in the lateral to enforce a 50' south boundary setback, preventing frac out. ๐ Page: 2 of 10, Bakken Setback Summary Statement The south setback is not a standard distance; it's based on a specific engineering design (cemented liner shoe) to isolate the boundary. This is a non-routine wellbore construction constraint imposed by the regulator. |
2025-06-12 | Completions / Frac |
| Tier 3 |
Anti-collision report shows a 'No-Go Zone - Stop Drilling' warning with offset well 'Federal 10-41 (P&A)' at ~17,700' MD. ๐ Anticollision Report Summary The directional plan has a flagged collision risk requiring drilling to stop. This is a critical, non-routine operational hazard that must be actively managed during drilling. |
2025-01-27 | Directional Drilling |
| Tier 3 |
Permit renewal request for a new well APD, indicating extended planning horizon or delayed spud.โฐ TIME-SENSITIVE ๐ SUNDRY FORM FOR WELL FILE NO.: 42000 DESCRIPTION (OPERATOR) Renewal request dated 2026 for a permit with original approval in 2025 suggests the operator is securing a long-term window for this location, possibly due to rig scheduling, pad sequencing, or waiting on partner alignment. This is not a routine spud imminent signal. |
2026-05 29 | Drilling Rigs |