โ† Back to Daily Permits

๐Ÿ›ข๏ธ Gail Arnold 33-28-21 3H

Phoenix Operating LLC ยท Divide County, ND ยท File #42016 ยท Generated 2026-02-13 22:30

API
3302301633
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Use of wet shoe sub with ability to frac out the toe, backed up by hydraulic toe sleeve and ball seat for testing liner.
๐Ÿ“„ Proposed Casing Program and Completion Design
Advanced completion design allowing toe fracturing, non-routine for horizontal Bakken wells to enhance stimulation efficiency.
Relative Completions / Frac
Tier 3 Landing target adjusted downward 4' to 9,448' TVD based on gamma correlations at Base of Last Salt and Mission Canyon, confirmed against offsetting well Gail Arnold 33-28-21 4H.
๐Ÿ“„ Geological Summary - Curve section
Real-time geological adjustments during drilling to optimize placement in Middle Bakken, demonstrating adaptive geosteering.
2025-10-17 General Oilfield Services
Tier 3 Waiver requested for open hole logs, citing offsetting well B MOE TRUST 33-28-160-98H 1BP within 1 mile for formation tops establishment.
๐Ÿ“„ Sundry Form for Open Hole Log Waiver
Non-standard regulatory choice to forego open hole logs, relying on nearby well data, potentially reducing costs and accelerating operations.
2025-06-19 Regulatory / Permitting
Tier 3 Waiver for drill cutting samples in vertical portion from Base of Last Salt to KOP, collecting from offsetting well Gail Arnold 33-28-21 1H instead.
๐Ÿ“„ Sundry Form for Drill Cutting Samples Waiver
Deviation from standard sampling protocol by substituting with pad-mate well samples, indicating efficiency in multi-well pad operations.
2025-06-19 Regulatory / Permitting
Tier 3 Notification to adjacent operators (PetroHunt, Whiting/Chord Energy) of drilling plan, including trajectory, targets, and casing details for wells traversing outside spacing unit.โฐ TIME-SENSITIVE
๐Ÿ“„ Acknowledgement and Notice to Adjacent Operators
Proactive compliance with NDIC Order 31848 for wells entering adjacent spacing units, ensuring no interference.
2025-06-11 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion services (liner installation, frac-out tools)
Well reached TD on 2025-10-22 and is waiting for production liner ops, indicating immediate opportunity post-drilling.
Geosteering and directional drilling support
Real-time adjustments during curve and lateral phases completed; future pads may require similar precision tools.
Regulatory and waiver assistance
Multiple waivers approved in June 2025; operators in Skabo field may seek similar cost-saving strategies.