โ† Back to Daily Permits

๐Ÿ›ข๏ธ Gail Arnold 33-28-21 4H

Phoenix Operating, LLC ยท Divide County, North Dakota County, ND ยท File #42017 ยท Generated 2026-02-09 17:05

API
33-023-01634
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Waiver for tubing/packer requirement, citing well design assurances for safety during flowback.
๐Ÿ“„ Sundry Form ID: 254343
Non-routine casing design choice, allowing flowback without packer.
2025-06-18 Regulatory / Permitting
Tier 3 Well encountered Last Bakken Shale (LBS) at 10,199' MD on 10/14/2025, leading to decision to cement back and skid to adjacent well Gail Arnold 33-28-21 3H, followed by sidetrack (ST1) drilling starting 10/24/2025.
๐Ÿ“„ Geological Summary, page 4-5
Sidetrack indicates unexpected geological encounter requiring operational pivot, not standard horizontal drilling progression.
2025-10-14 General Oilfield Services
Tier 3 Waiver requested for open hole logs, citing sufficient logs from offset well MOE TRUST 33-28-160-98H 1BP within 1 mile.
๐Ÿ“„ Sundry Form ID: 254298
Bypasses routine logging requirements, potentially to expedite operations.
2025-06-18 Regulatory / Permitting
Tier 3 Waiver for filter sock container, as operator does not use filtration media during drilling.
๐Ÿ“„ Sundry Form ID: 254332
Exemption from standard waste containment, reflecting specific drilling practices.
2025-06-18 Regulatory / Permitting
Tier 3 Operator requested waiver for drill cutting samples in vertical section, collecting samples from offset well Gail Arnold 33-28-21 1H instead.
๐Ÿ“„ Sundry Form ID: 254326
Non-standard regulatory compliance, reducing on-site sampling efforts.
2025-06-18 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Geosteering
Sidetrack on 10/24/2025 requires immediate directional services; StarSteer and Baker Hughes motor in use for precise placement.
Mud Logging and Geological Monitoring
2 Bees Consulting active through October 2025; Pason Systems for data recording during final drilling phase.
Completion Preparation
Well at TD 10/27/2025, preparing for liner operations; waiver for tubing/packer signals flowback services needed soon.