โ† Back to Daily Permits

๐Ÿ›ข๏ธ Gail Arnold 33-28-21 5H-LL

Phoenix Operating LLC ยท Divide County, ND ยท File #42018 ยท Generated 2026-02-13 22:31

API
3302301635
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Operator requested and received waivers for filter sock container, drill cutting samples, open hole logs, and tubing/packer requirements, citing operational efficiencies and offsetting well data.
๐Ÿ“„ WELL SUNDRY FORMS (multiple entries)
Waivers deviate from standard NDIC regulations, indicating cost-saving measures and reliance on adjacent well data for compliance.
2025-06-18 Regulatory / Permitting
Tier 2 Use of wet shoe with ability to frac out the toe, and production liner cemented with wet shoe.
๐Ÿ“„ PROPOSED DRILLING PLAN, Page 3
Non-standard completion design allowing toe fracturing, differing from dry shoe setups.
Relative Completions / Frac
Tier 3 Use of specific drilling tools: Reed RH54-C3 drill bit with Baker Hughes mud motor (1.4ยฐ bend) for lateral drilling, and StarSteer software for real-time geosteering.
๐Ÿ“„ Geological Summary, Page 4
Selection of premium directional drilling technology for precise trajectory control, not standard for all operators.
2025-10-05 Directional Drilling
Tier 3 Well landed precisely 27 feet into Middle Bakken Formation with 100% stratigraphic placement, using offset well correlations and StarSteer software.
๐Ÿ“„ Geological Summary, Pages 4-5
Achieved perfect in-zone drilling without deviations, supported by detailed facies mapping (B, C, D, E).
2025-10-04 General Oilfield Services
Tier 3 Geological steering and mud logging services provided by 2 Bees Consulting LLC, with on-site personnel Lindsay Lien, Michael Francis, and Chad Olson.โฐ TIME-SENSITIVE
๐Ÿ“„ Geological Summary, Page 3
Outsourcing to a specialized third-party consultant for real-time geological services, rather than in-house.
2025-10-03 Mud / Fluids
Tier 3 Notices sent to adjacent operators (PetroHunt and Whiting/Chord Energy) regarding wellbore trajectory through adjacent spacing units, per NDIC Order 31848.
๐Ÿ“„ AFFIDAVIT AND ACKNOWLEDGEMENT, Page end
Proactive compliance for inter-unit drilling, including sharing directional plans and contact info.
2025-06-11 Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and Geosteering Services
Rig spud on 2025-10-01 with lateral start 2025-10-05; immediate need for tools like Baker Hughes motors and StarSteer software to achieve precise landing.
Geological Consulting
Services began 2025-10-03 in Charles Formation; ongoing requirement for 2 Bees Consulting during drilling to TD 2025-10-09.
Regulatory and Surveying Support
Waivers and notices filed June 2025; pre-spud opportunity for surveying firms like Uintah for pad layout and proximity maps.