| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Motor failure in BHA 5 requiring trip to replace motor and drill bit ๐ Operations section Equipment failure interrupting drilling, not standard operational flow |
2025-08-18 | General Oilfield Services |
| Tier 3 |
Rig hot stacked for 8 days after curve completion before resuming lateral drillingโฐ TIME-SENSITIVE ๐ Geological Summary Unusual delay in operations not typical for continuous horizontal drilling, potentially indicating operational adjustments or resource allocation |
2025-08-09 | Drilling Rigs |
| Tier 3 |
Change in completion method to 100' setback with wet shoe, no ability to frac out, allowing pump-down of perforating guns ๐ Change in Completion Method Sundry Deviation from standard completion design to enable specific stimulation approach |
2025-07-23 | Completions / Frac |
| Tier 3 |
Request for waiver of open hole logs, proposing to run on offsetting well LC Rambousek 1-9H ๐ Open Hole Log Waiver Sundry Non-standard regulatory choice to avoid redundant logging, leveraging offset data |
2025-06-17 | Regulatory / Permitting |
| Tier 3 |
Waiver for filter sock container during drilling and completions phases, limiting to drill-out only ๐ Filter Sock Container Waiver Sundry Regulatory exception to reduce on-site waste management during non-filtration phases |
2025-06-17 | Regulatory / Permitting |