| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Change in completion method to wet shoe with no ability to frac out, allowing pumping of first perforating guns down, with 100' north boundary setback.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No. 42020, Form ID: 259762 Deviation from original permitted completion method, indicating adaptive design to enable specific perforation strategy without fracking capability. |
2025-07-23 | Completions / Frac |
| Tier 3 |
Spud notification with Stoneham Rig 16, company representative Nick Bunney. ๐ Sundry Form for Well File No. 42020, Form ID: 259116 Actual start of drilling operations, specifying rig and personnel. |
2025-07-20 | Drilling Rigs |
| Tier 3 |
Waiver for open hole logs by using GR-CBL from offset well LC Rambousek 1-9H within one mile. ๐ Sundry Form for Well File No. 42020, Form ID: 253781 Regulatory waiver to substitute logging requirements with offset data, reducing operational steps. |
2025-06-17 | Regulatory / Permitting |
| Tier 3 |
Waiver for filter sock container during drilling and completions except drill-out phase. ๐ Sundry Form for Well File No. 42020, Form ID: 253784 Approval to limit on-site waste containment, citing reduced debris during non-filtration phases. |
2025-06-17 | Regulatory / Permitting |